2005’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 23 Aug 2004 View the source for Final investment decisionFinal investment decision Aug 2014 View the source for Offshore constructionOffshore construction Jul 2015 View the source for First powerFirst power Sep 2016 View the sources for Commercial operationCommercial operation 25 Jan 2017 No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDVattenfall → Stadtwerke München — 49.0% 2014-08 JV ENTRYTODAYVattenfall — 51% today · operator Vattenfall Vattenfall 51%Stadtwerke München — 49% today · investor Stadtwerke München Stadtwerke München 49%Vattenfall → Stadtwerke München — 49.0% 49%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2017-Q12017-01-25 · 2 recorded revisions · held (announced 2017-Q1, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing7372 turbines + 2 platforms expected · 1 fewer than expected — a position the survey missed
Surveyed2026-08-31from 95 satellite passes
Built2015-07 → 2017-01-25offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-06Copernicus Sentinel-1 radar satellite, southbound pass · 2 newer passes skipped because the satellite’s track only caught part of the farm (the best of them 0%)
Farm covered100%the whole farm lies inside the image
Structures ringed73 confirmed · 0 not yet confirmedas counted on 2026-08-31 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortEsbjerg ·installation · quay 10000 m · crane 300 t · draft 15 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-06
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (73)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Sandbank, 2026-09-06
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationUmspannplattform Sandbank·33/155 kV · in service 2016 · owner Vattenfall / Stadtwerke Muenchen (wind farm owners) — farm-owned, not TSO-owned
HVDC systemSylWin1·864 MW · ±320 kV · in service 2015-04 · shared with Butendiek, DanTysk
Converter supplierSiemens·SylWin1 · Nordic Yards (Warnowwerft, Rostock) · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
2014201520162017201820192020202120222023202420252026developer’s stated start 2017-Q1nowSylWin1SylWin1first planned 2014first planned 2014in service 2015-04in service 2015-04Umspannplattform SandbankUmspannplattform Sandbankin service 2016in service 2016

Sources & verification

17/18 fields verified · rests on 11 sources (7 primary) · ◆ 9 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[1]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2004-08-23◆ Genehmigungsbescheid Offshore-Windpark S…
“Hamburg, den 23.08.2004 … Genehmigungsbescheid … werden Errichtung und Betrieb von 80 einzelnen Windenergieanlagen (WEA) einschließlich Nebenanlagen genehmigt. … Dieser liegt ca. 90 km westlich Sylt. …”
supportsConsentWater depthDistance from shoreCoordinatesConsent granted
[11]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "OWP Sandbank": 72 units, 302.4 MW gross, statuses {'In Betrieb': 72}, operators ['DanTysk Sandbank Offshore Wind GmbH & Co.KG'], commissioned 2016-09-06..2017-01-25, planned None..None.”
supportsRegister entry
Operator5
[2]
Offshore Wind Biz2014-08-11◆ Vattenfall, Stadtwerke München Decide to…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[3]
Offshore Wind Biz2015-07-08◆ Sandbank OWF Construction Kicks Off | Of…
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rights
[4]
Vattenfall AB2016-09-09◆ Correction: Sandbank Offshore Wind Farm …
“The offshore wind power plant Sandbank, located 90 kilometers west of the island of Sylt, has now supplied the German electricity network with its first wind power from the North Sea. The first of a t…”
supportsFirst power
[5]
Vattenfall AB2017-01-27◆ Sandbank offshore wind farm commissioned…
“On 25. January, the offshore wind farm Sandbank started to deliver power to the grid. … Sandbank, located 90 kilometers west of the island of Sylt, is accordingly fully commissioned. … Vattenfall hold…”
supportsoperatorinvestorCommercial operationCOD historyTurbines+2 more
[6]
Vattenfall AB2017-07-24◆ Offshore wind farm Sandbank now official…
“The offshore wind farm Sandbank with an installed capacity of 288 megawatt (MW) is now officially inaugurated. … The construction start of Sandbank on the high seas took place in summer 2015. … Vatten…”
supportsCommercial operation
Trade press4
[7]
Power Technology (GlobalData)2017◆ Sandbank Offshore Windfarm, North Sea
Press report — cited, not quoted; read it at the source link.
supportsModelUnit capacityFoundationStatusConnection point
[8]
Offshore Wind Biz2015-02-23◆ WINDFARM UPDATES: Sandbank & Wikinger | …
Press report — cited, not quoted; read it at the source link.
supportsFoundationinstallation
[9]
Noerr LLP2014
“Das optionale Stauchungsmodell, nach dem in den ersten acht Jahren nach Inbetriebnahme eine höhere Anfangsvergütung gezahlt wird … § 50 Abs. 1–3 EEG 2014 … 19,40 ct/kWh … für Anlagen, die bis Ende 201…”
supportsMechanismDetail
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026