Deutsche Bucht
Located 95 km northwest of the island of Borkum in the German North Sea EEZ, at 38–42 m water depth.
Technology
Capacity
260.4 MW ◆
Turbines
31 × 8.4 MW ◆
Model
Mhi Vestas V164 8-4 ◆
Foundation
Monopile+Suction bucket ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
38–42 m ◆
Distance from shore
95 km ◆
Wind speed
9.9 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Secured · 2019-07 ◆
Connection
TenneT BorWin beta (BorWin2) HVDC offshore converter platform ◆
Schedule
FID
18 Aug 2017 ◆
COD
31 Mar 2020 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Acquisition · 2017-03
Highland Group Holdings → Northland Power 100%
- Stake
- 100%
- Consideration
- not disclosed
- Announced
- 2017-03
- Closed
- 2017-08
- Project stage
- consented
Northland Power acquired 100% from Highland Group. Total project cost ~EUR 1.3bn (CAD 1.9bn), of which ~EUR 988m project-financed debt. Northland contributed ~EUR 312m corporate equity. Commissioned 2020.
Evidence
- northlandpower.com — Northland Power Completes Acquisition of Deutsche Bucht Offshore Wind Farm ↗ ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2019→2020-Q1→2020-03-31 · 3 recorded revisions · slipped +0.7 yr (first announced 2019)
Revenue & offtake the regime the project was built under
Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations30 of 31≈97% · first seen 2018-09-02
Turbines29 of 31≈94% · first seen 2018-12-02
Latest count2021-12-30from 797 satellite passes · 2 substation platforms left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (31 turbines + 2 platforms); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
Satellite image
Image taken2026-09-06≈Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed32 confirmed · 0 not yet confirmed≈as counted on 2021-12-30 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortCuxhaven (Cuxport Terminal) ◆·foundations · quay 734 m · crane 650 t · draft 12.7 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-06
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (32)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationDeutsche Bucht offshore substation·33/155 kV · in service 2019 · owner Northland Power (wind farm owner) — farm-owned, not TSO-owned
HVDC systemBorWin2·800 MW · ±300 kV · in service 2015-01 · shared with Albatros, Veja Mate
Converter supplierSiemens (HVDC PLUS); Prysmian cables·BorWin2 · Nordic Yards, Warnemünde, Germany · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
17/18 fields verified · rests on 12 sources (8 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[9]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2010-02◆ Genehmigungsbescheid Offshore-Windpark D…
“Auf den Antrag der Eolic Power GmbH ... werden Errichtung und Betrieb von 42 Windenergieanlagen (WEA) einschließlich Nebenanlagen im Bereich der deutschen ausschließlichen Wirtschaftszone (AWZ) in der…”
supportsConsentConsent granted
[13]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Deutsche Bucht": 31 units, 260.4 MW gross, statuses {'In Betrieb': 31}, operators ['Northland Deutsche Bucht GmbH'], commissioned 2019-07-26..2019-09-25, planned None..None.”
supportsRegister entry
Operator5
[1]
[2]
Northland Power2017-08-18◆ Northland Power's Deutsche Bucht Offshor…
“Deutsche Bucht ... project has reached financial close ... August 18, 2017 ... EUR1.3 billion ... Northland Power holds 100% equity ... approximately EUR 184/MWh for 8 years and EUR 149/MWh for the re…”
supportsFinal investment decisionMechanismDetail
[3]
Northland Power2017-08-17◆ Northland Power Completes Acquisition of…
“Northland Power Inc. announced that it has completed the acquisition of 100% of the shares of British Wind Energy GmbH, which owns the Deutsche Bucht offshore wind project, from Highland Group Holding…”
supportsoperator
[4]
Northland Power2020-04-01◆ Northland Power's Deutsche Bucht Offshor…
“252 megawatt (MW) Deutsche Bucht offshore wind farm achieves full project completion ... March 31, 2020 ... All 31 monopile foundation turbines ... began generating power at the end of September 2019 …”
supportsCommercial operationCOD history
[5]
OEM1
[6]
Vestas / MHI Vestas Offshore Wind2018-07-20◆ Financial Close for Industry First Demo …
“the first offshore wind farm worldwide to test the Mono Bucket foundation structure under commercial operating conditions ... V164-8.4 MW turbines ... two turbines ... 17 MW of capacity ... financial …”
supportsModelUnit capacityFoundation
Trade press4
[7]
[8]
[10]
[11]