Deutsche Bucht

Located 95 km northwest of the island of Borkum in the German North Sea EEZ, at 38–42 m water depth.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted Feb 2010 View the source for Final investment decisionFinal investment decision 18 Aug 2017 View the source for Offshore constructionOffshore construction Sep 2018 View the source for First powerFirst power Jul 2019 View the source for Commercial operationCommercial operation 31 Mar 2020 No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDHighland Group Holdings → Northland Power — 100.0% · closed 2017-08 2017-03 ACQUISITIONTODAYHighland Group Holdings Highland Group Holdings Highland Group Holdings exited 2017-03Northland Power — 100% today · operator Northland Power Northland Power 100%Highland Group Holdings → Northland Power — 100.0% · closed 2017-08 100%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 20192020-Q12020-03-31 · 3 recorded revisions · slipped +0.7 yr (first announced 2019)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations30 of 3197% · first seen 2018-09-02
Turbines29 of 3194% · first seen 2018-12-02
Latest count2021-12-30from 797 satellite passes · 2 substation platforms left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (31 turbines + 2 platforms); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
10203033 planned (turbines and platforms)latest count 2021-12-30foundations — running total, confirmedSep 2018 — 6 this month · 6 in totalOct 2018 — 4 this month · 10 in totalNov 2018 — 9 this month · 19 in totalDec 2018 — 6 this month · 25 in totalJan 2019 — 3 this month · 28 in totalJun 2019 — 1 this month · 29 in totalJul 2019 — 1 this month · 30 in totalAug 2019 — 1 this month · 31 in totalSep 2019 — 0 this month · 31 in totalNov 2019 — 1 this month · 32 in totalturbines up — running total, confirmedSep 2018 — 0 this month · 0 in totalOct 2018 — 0 this month · 0 in totalNov 2018 — 0 this month · 0 in totalDec 2018 — 1 this month · 1 in totalJan 2019 — 0 this month · 1 in totalJun 2019 — 12 this month · 13 in totalJul 2019 — 7 this month · 20 in totalAug 2019 — 8 this month · 28 in totalSep 2019 — 1 this month · 29 in totalNov 2019 — 2 this month · 31 in total32 foundations31 turbines upSep 2018Nov 2018Jan 2019Jul 2019Sep 2019
Satellite image
Image taken2026-09-06Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed32 confirmed · 0 not yet confirmedas counted on 2021-12-30 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortCuxhaven (Cuxport Terminal) ·foundations · quay 734 m · crane 650 t · draft 12.7 m
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-06
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (32)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Deutsche Bucht, 2026-09-06
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationDeutsche Bucht offshore substation·33/155 kV · in service 2019 · owner Northland Power (wind farm owner) — farm-owned, not TSO-owned
HVDC systemBorWin2·800 MW · ±300 kV · in service 2015-01 · shared with Albatros, Veja Mate
Converter supplierSiemens (HVDC PLUS); Prysmian cables·BorWin2 · Nordic Yards, Warnemünde, Germany · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
201320142015201620172018201920202021developer’s stated start 2020-Q1nowBorWin2BorWin2first planned 2013first planned 2013in service 2015-01in service 2015-01Deutsche Bucht offshore substationDeutsche Bucht offshore substationin service 2019in service 2019

Sources & verification

17/18 fields verified · rests on 12 sources (8 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[9]
Bundesamt für Seeschifffahrt und Hydrographie (BSH)2010-02◆ Genehmigungsbescheid Offshore-Windpark D…
“Auf den Antrag der Eolic Power GmbH ... werden Errichtung und Betrieb von 42 Windenergieanlagen (WEA) einschließlich Nebenanlagen im Bereich der deutschen ausschließlichen Wirtschaftszone (AWZ) in der…”
supportsConsentConsent granted
[13]
Bundesnetzagentur — Marktstammdatenregister2026-08-23◆ Marktstammdatenregister (MaStR) offshore…
“Park row "Deutsche Bucht": 31 units, 260.4 MW gross, statuses {'In Betrieb': 31}, operators ['Northland Deutsche Bucht GmbH'], commissioned 2019-07-26..2019-09-25, planned None..None.”
supportsRegister entry
Operator5
[1]
Northland Power2025
“31x MHI Vestas 8.4 MW turbines ... 100% owner of the €1.5 billion Deutsche Bucht offshore wind farm ... completed in March 2020 ... 95 km west of Borkum in the German Exclusive Economic Zone ... 39-41…”
supportsUnit capacityWater depthDistance from shore
[2]
Northland Power2017-08-18◆ Northland Power's Deutsche Bucht Offshor…
“Deutsche Bucht ... project has reached financial close ... August 18, 2017 ... EUR1.3 billion ... Northland Power holds 100% equity ... approximately EUR 184/MWh for 8 years and EUR 149/MWh for the re…”
supportsFinal investment decisionMechanismDetail
[3]
Northland Power2017-08-17◆ Northland Power Completes Acquisition of…
“Northland Power Inc. announced that it has completed the acquisition of 100% of the shares of British Wind Energy GmbH, which owns the Deutsche Bucht offshore wind project, from Highland Group Holding…”
supportsoperator
[4]
Northland Power2020-04-01◆ Northland Power's Deutsche Bucht Offshor…
“252 megawatt (MW) Deutsche Bucht offshore wind farm achieves full project completion ... March 31, 2020 ... All 31 monopile foundation turbines ... began generating power at the end of September 2019 …”
supportsCommercial operationCOD history
[5]
Northland Power2018
“two additional pilot wind turbines ... an additional 17 MW of capacity to the base 252 MW project for a total of 269 MW ... two turbines using Mono Bucket foundations ... a new type of foundation stru…”
supportsTotal capacityFoundation
OEM1
[6]
Vestas / MHI Vestas Offshore Wind2018-07-20◆ Financial Close for Industry First Demo …
“the first offshore wind farm worldwide to test the Mono Bucket foundation structure under commercial operating conditions ... V164-8.4 MW turbines ... two turbines ... 17 MW of capacity ... financial …”
supportsModelUnit capacityFoundation
Trade press4
[7]
Offshore Wind Biz2019-07-29◆ Deutsche Bucht Delivers First Power | Of…
Press report — cited, not quoted; read it at the source link.
supportsFirst powerTurbinesFoundation
[8]
NS Energy2020
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsTurbinesModelUnit capacity+5 more
[10]
Offshore Wind Biz2019-01-08
Press report — cited, not quoted; read it at the source link.
supportsfoundations
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed