Fujian Changle Waihai Area C
Located 31-48 km east of Changle coast, Fujian. 72 three-leg suction pile jacket foundations. Annual generation ~1 TWh.
Status
Operationallifecycle stage
Ownership
FFFujian Funeng — 50% ◇
CTChina Three Gorges — 50% ◇
Location
Taiwan Strait
Technology
Capacity
496 MW ◇
Turbines
72 ◇
Model
Various Cssc 6-7-8-0-10-0 MW ◇
Foundation
Jacket ◇
Site & conditions
Site rights
Seabed rights held ∴
Water depth
35–43 m ≈
Wind speed
10.4 m/s @ 100 m ≈
Revenue & grid
Offtake
—
Grid
Not recorded ◇
Connection
Fuzhou 220 kV onshore substation ◇
Schedule
FID
Taken · date not recorded ∴
COD
Oct 2023 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
4 dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 11 sources (2 primary)
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[10]
Fuzhou Changle Ecological Environment Bureau (福州市长乐生态环境局)2023-10-19
“长乐外海海上风电场C区项目...海洋工程环保竣工验收决定的公示...2023年10月19日-2023年10月26日(5个工作日)”
supportsCommercial operation
Operator2
[6]
Fujian Yongfu Power Engineering Co., Ltd. (永福股份)2019-01-10
“2018年12月29日与31日,永福股份与福建省水利水电勘测设计研究院联合设计的福建长乐外海海上风电场A区、C区项目分别获得福建省发展和改革委员会核准”
supportsConsentConsent granted
[8]
China Power News Network (中国电力新闻网)2021-10-25
Press report — cited, not quoted; read it at the source link.
supportsFirst power
Trade press7
[2]
[3]
[4]
[5]
[7]
Changle News Network (长乐新闻网)2020-01-08
“近日,福能海峡长乐外海海上风电场A区、C区项目陆上集控站破土动工。”
supportsOnshore constructionSite rights
[9]
龙船风电网 (imarine.cn)2023-10-25
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionCommercial operation
[11]
Unverified import1