Pingtan Offshore Area A
Pingtan Offshore Area A is an offshore wind farm in the Taiwan Strait, China, owned by China Energy Engineering Group, in advanced development.
Status
Advanced Developmentlifecycle stage
LikelyHafrok delivery likelihood
Ownership
CEChina Energy Engineering Group — 100% ◇
Location
Taiwan Strait
Technology
Capacity
450 MW ◆
Turbines
29 × 16 MW ◇
Foundation
Fixed-bottom (structure not recorded) ◇
Site & conditions
Site rights
Seabed rights held 2023-05 ◆
Water depth
6–21 m ≈
Wind speed
10.6 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Not taken
COD · announced
Oct 2028 ◇
COD · Hafrok
for registered readers
Delivery outlook modelled by Hafrok · calibrated on delivered projects
LikelyHafrok's delivery likelihood for Pingtan Offshore Area A
The developer says Oct 2028. Hafrok's year agrees with that date; the year, the chance and the working are for registered readers.
Free for registered readers in early access · register below ↓
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
1 dated milestone on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 8 sources (2 primary) · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[6]
福建省发展和改革委员会 (Fujian Provincial Development and Reform Commission)2025-05-30◆ 福建省发展和改革委员会关于同意平潭A区海上风电场项目核准延期的批复
“我委于2023年5月31日以闽发改网审能源函〔2023〕53号文核准批复了平潭A区海上风电场项目(项目编码:2304-350000-04-01-471371)。 ... 同意该项目核准文件有效期延长1年。 项目其余事项仍按闽发改网审能源函〔2023〕53号文执行,项目核准只能延期一次,期限最长不得超过1年,届时若仍未开工建设,该核准文件自动失效”
supportsConsentSite rightsConsent granted
Operator1
[7]
中国能源建设股份有限公司 (China Energy Engineering Corporation)2023-06-07◆ 中国能源建设股份有限公司 总部新闻 中国能建投资的首个海上风电项目获核准
“装机规模为450兆瓦 ... 拟同步建设一座海上220千伏升压站及一座陆上集控中心”
supportsTotal capacity
Auction pipeline1
[8]
gdshe.org (relaying 北极星风力发电网)2024-07◆ cn-gx2024-launch
广西北海海上风电竞争性配置…N场址…规划容量570万千瓦,P场址规划容量80万千瓦 (~6,500 MW deep-sea), ~94-120 km offshore, 15-45 m depth.
supportsGuangxi Beihai Deep-Sea Offshore Wind Competitive Allocation (广西深远海竞配)
Trade press5
[1]
Global Energy Monitor2026◆ Fujian Pingtan offshore area A wind farm…
supportsownerTotal capacityFoundationCoordinates
[2]
[3]
[4]
Global Energy Monitor◆ Global Wind Power Tracker Methodology
“Offshore hard mount: have wind turbines that are usually designed for installation in water no deeper than 60 meters [...] These turbines are mounted directly onto the sea floor. Offshore floating: ar…”
supportsFoundation
[5]
国际风能网 (International Wind Power Network)2026-05-13◆ 66亿!福建464MW海上风电项目8月开工,拟装29台16MW大风机
Copyrighted source — cited, not quoted; read it at the source link.
supportsFirst powerCommercial operationTurbinesUnit capacity