Araioses
Maranhão coast, northeast Brazil. Grid infrastructure less developed.
Technology
Capacity
2,808 MW ◇
Turbines
—
Foundation
—
Site & conditions
Site rights
Application filed Environmental licence application ◆
Water depth
15–27 m ≈
Wind speed
8.5 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Not taken
COD · developer
2033 announced ○
Delivery outlook not forecast
We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.
Revenue & offtake route to market — open
No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operation2033
Sources & verification
1/9 fields verified · rests on 7 sources · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[2]
[7]
IBAMA (Diretoria de Licenciamento Ambiental)2026-02-27◆ Complexos Eolicos Offshore - projetos co…
“Table 'Complexos Eolicos Offshore - projetos com processo de licenciamento ambiental tramitando no Ibama' (edition 2026-02-27), row: 21 MA-03 - Araioses PETROLEO BRASILEIRO S/A - PETROBRAS 02001.03131…”
supportsSite rights
Operator1
[3]
Trade press3
[4]
[5]
[6]
Unverified import1
[1]
unknown◆ Petrobras Unveils 23 GW Wind Power Play …
Press report — cited, not quoted; read it at the source link.
supportsConsentCommercial operationTotal capacityWater depthCoordinates
