C-Power

Thornton Bank, ~30 km off the West Flanders coast.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2004’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to C-Power NVBelgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) Jun 2003 · auction recordView the source for Consent grantedConsent granted 2003 View the source for Construction startConstruction start May 2007 View the source for Final investment decisionFinal investment decision 2007 View the sources for Commercial operationCommercial operation Sep 2013 Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to C-Power NV 2003-06 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDSocofe / Ecotech Finance / EDF Energies Nouvelles / DEME / Nutsbedrijven Houdstermaatschappij → RWE Innogy — 26.72% 2009-05 JV ENTRYEDF Energies Nouvelles → Marguerite Fund — 9.14% 2011-12 Marguerite Fund → Marguerite Pantheon (Pantheon) — 10.0% · closed 2017-12 2017-08 Marguerite Pantheon (Pantheon) → Existing C-Power co-shareholders — 10.0% 2024-02 Transfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYC-Power NV C-Power NV C-Power NV not among today’s recorded owners — no sale recordedSocofe Socofe Socofe exited 2009-05Ecotech Finance Ecotech Finance Ecotech Finance exited 2009-05EDF Energies Nouvelles EDF Energies Nouvelles EDF Energies Nouvelles exited 2011-12DEME DEME DEME exited 2009-05Nutsbedrijven Houdstermaatschappij Nutsbedrijven Houdsterm… Nutsbedrijven Houdsterm… exited 2009-05RWE — 26.7% today · operator RWE RWE 26.7%Marguerite Pantheon (Pantheon) Marguerite Fund Marguerite Fund exited 2024-02Existing C-Power co-shareholders Existing C-Power co-sha… Existing C-Power co-sha… exited 2024-02C-Power Holdco — 63.3% today C-Power Holdco C-Power Holdco 63.3%EDF Renewables — 10% today EDF Renewables EDF Renewables 10%Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank) — awarded to C-Power NV Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Socofe / Ecotech Finance / EDF Energies Nouvelles / DEME / Nutsbedrijven Houdstermaatschappij → RWE Innogy — 26.72% Socofe / Ecotech Finance / EDF Energies Nouvelles / DEME / Nutsbedrijven Houdstermaatschappij → RWE Innogy — 26.72% Socofe / Ecotech Finance / EDF Energies Nouvelles / DEME / Nutsbedrijven Houdstermaatschappij → RWE Innogy — 26.72% Socofe / Ecotech Finance / EDF Energies Nouvelles / DEME / Nutsbedrijven Houdstermaatschappij → RWE Innogy — 26.72% Socofe / Ecotech Finance / EDF Energies Nouvelles / DEME / Nutsbedrijven Houdstermaatschappij → RWE Innogy — 26.72% 26.72% → consortiumEDF Energies Nouvelles → Marguerite Fund — 9.14% 9.14%Marguerite Fund → Marguerite Pantheon (Pantheon) — 10.0% · closed 2017-12 Marguerite Pantheon (Pantheon) → Existing C-Power co-shareholders — 10.0% 10%Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2013-Q32013-09 · 2 recorded revisions · held (announced 2013-Q3, unchanged)

Revenue & offtake contract duration and price levels · money of the day

325 MW contracted — concession
Concession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Price€107/MWh ·Capacity325 MWAwardedJun 2003
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing1254 turbines + 1 platform expected · 43 fewer than expected — small or closely spaced early turbines fall below the radar threshold or merge into one return
Surveyed2026-09-01from 120 satellite passes
Built2013-09offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed12 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (12)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over C-Power, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationC-Power Offshore Transformer Station (OTS)·33/150 kV · in service 2013 · owner C-Power (the wind farm project company — NOT Elia)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20132014201520162017201820192020202120222023202420252026developer’s stated start 2013-09nowC-Power Offshore Transformer Station (OTS)C-Power Offshore Transformer Stat…in service 2013in service 2013

Sources & verification

15/19 fields verified · rests on 13 sources (6 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator4
[1]
C-Power NV2025-01-01
“54 wind turbines with a total capacity of 325 MW ... Thornton Bank, situated in the North Sea, 30 km from the Belgian shoreline ... obtained all permits and licenses in 2003 and finalised the construc…”
supportsTurbinesTotal capacityDistance from shore
[2]
C-Power NV2025-01-01◆ Concession | C-Power
“In 2003 C-Power obtained a domain concession and the permits to build and operate an offshore wind farm in the Exclusive Economical Zone on the Belgian Continental Shelf.”
supportsConsentConsent granted
[3]
C-Power NV2025-01-01◆ Cables | C-Power
“The (150 kV) land cables are buried underground and run over a distance of 3,3 km, to the 'Slijkens' high-voltage station in Bredene, where they are connected to the main high-voltage grid.”
supportsStatusConnection point
[9]
SOCOFE2024-02-15
“la part détenue par C-POWER HOLDCO en C-POWER est passée de 53,9% à 63,3% [...] l'Allemand RWE (pour 26,7%) [...] du Français EDF (10%) [...] DEME CONCESSION WIND et NUHMA en ont profité pour transfér…”
supportsowneroperator
Auction results1
[16]
RBINS / MUMM (Brabant, Degraer & Rumes, 2011 — Offshore wind farms in the Belgian part of the North Sea, ch. 2)2011◆ rbins-mumm-2011-belgian-owf-ch2
Table 1, "Overview of the dates when the projects were granted a domain concession and an environmental permit": C-Power 27/06/03 · Belwind 5/6/2007 · Eldepasco 15/5/2006 · Norther 5/10/2009 · Rentel …
supportsConcession · Belgian offshore wind zone — domain concessions (Thornton Bank–Bligh Bank)
Trade press8
[4]
offshoreWIND.biz2010-11-26◆ EUR 1,289 M Investment Financing for the…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionTurbinesModelUnit capacityFoundation
[5]
NS Energy Business2022-01-01
Press report — cited, not quoted; read it at the source link.
supportsConstruction startUnit capacityFoundationWater depth
[6]
offshoreWIND.biz2013-09-17
Press report — cited, not quoted; read it at the source link.
supportsCOD history
[8]
CMS Law2024-01-01◆ CMS Expert Guide - Offshore wind in Belg…
“Offshore wind farms with financial close prior to 1 May 2014 can sell their Green Certificates to the TSO at a fixed minimum price of EUR 107 per MWh for the electricity that is generated from the fir…”
supportsMechanismDetail
[11]
Global Energy Monitor2026-07-02
supportsCoordinates
[12]
Power Technology
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[13]
offshoreWIND.biz2013-09-18
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[14]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed