Market profile

Lithuania

nascent * buildout: pending risk: pending outlook: pending

* maturity derived from capacity data; full assessment pending.

0
GW operational
0
GW in construction
0
GW pipeline
1
projects
On Hold · 0.7 GW (1)
Progress to target
0%
0 GW operational of 1 GW by 2030
Lithuanian offshore (two sites)
Next auction round
Lithuania offshore Site 2 — re-tender (undecided)
· tender · planned
0.7 GW offered
full auction outlook ↓

Assessment

Assessment pending

This market has a derived snapshot above but no in-depth assessment yet. Authored coverage rolls out market by market; the data here is live in the meantime.

State of the market

as of 2026-11-03
100%
of GW sited through contested rounds
delivered (metered), 2026 to 3 Nov 2026Expected Buildout (confidence-weighted), 2026 the remainder of the yearfleet expected by year end
Annual additions · delivered to 3 Nov 2026, expected afterGW per year
0GW/yr202021222324252627282930313233343536373839400.00.00.00.00.00.0
Cumulative fleet · year endsGW operating
00.5GW202021222324252627282930313233343536373839400.0 by year end0.00.0 on 3 Nov 20260.00.10.1

Delivered to 3 Nov 2026; expected from then. 0.7 GW of live pipeline weights to 0.1 GW expected to complete. Projects on hold, and projects with no dated milestone, are modelled and sit in the expected line.

Source: Hafrok · hafrok.com/markets/lithuania · data as of 3 Nov 2026

How this line is made

The Expected Buildout line answers one question: of the pipeline announced today, how much actually gets built, and when? It is not a scenario and not a target tracker; it is the database's live pipeline, passed through two filters measured from the industry's own delivery record.

Whether a project completes. Every project in development carries a completion weight, banded Delivering / Expected / Prospective / Fragile. A proposal (a site where no authority has yet granted rights) carries none and sits outside this line entirely; it is listed, not counted. The starting point is the historical completion rate of its lifecycle stage: of projects that reached construction, 97% delivered; financed but not yet building, 92%; consented or contracted but not yet financed, 75%; early development, 61%; on hold, 15%. That base rate is then adjusted by what the project has actually secured (offtake, grid, consents, investment decision) and decays if a project sits quiet past its stage's normal dwell time.

When it delivers. Each project also carries a completion-date distribution: a shape, not a single year, right-skewed because offshore wind slips late far more often than it runs early. The peak sits on a rule-based expected date chained from the project's latest achieved milestone; the width of the late tail is fitted to how far past their announced dates real projects actually landed: builders slip tight (60% on time, n=144), financed projects tighter still (76%, n=95), consented-only projects carry the fat tail, with 21% landing three or more years late (n=126). A stated date faster than any comparable project has ever achieved is floored to the achievable window and flagged, never taken at face value.

The line is the sum, across every live project, of capacity × completion weight × the probability it delivers in each year. For projects already under construction, a share of expected capacity is counted at first power, because turbines start generating before a wind farm is fully commissioned, so a market's chart can show capacity arriving a year before a project's stated completion date. Delivered history is metered fact; the line inherits every assumption above and nothing else.

Honest limits. The weights are calibrated on a fleet whose failures have so far been overwhelmingly pre-financing, so completion rates after FID rest on a record with few failures and are ceilings, not guarantees. The slip fitted on consented projects is the loosest (the "three or more years late" bucket spans many years). Policy shocks arrive faster than base rates move; the weights see a stop-work order only as its lifecycle consequences accrue. And the line redistributes as the database learns: it is re-derived on every data refresh, not frozen.

Full per-project workings (each project's weight, band, expected date and distribution) are on its project page. Calibration v2.0-phase0 · generated 2026-11-03; every figure above is read from the generated calibration file, never typed.

Auction outlook

forecast · 1 round tracked
Seabed leaseOfftake awardIntegrated tenderscheduled: bar spans the expected windowplanned (indicative)postponed / suspendedno date yet (off-axis)
202720282029today
NO DATE YETLithuania offshore Site 2 — re-tender (undecided) · planned
Integrated tender Lithuania offshore Site 2 — re-tender (undecided) planned
What the date rests on — indicative

Energy Minister Vaičiūnas said Lithuania is NOT abandoning the second farm but will decide HOW and under WHAT parameters only after consulting the European Commission on a revised scheme. So a re-tender is an announced intention with no date and no design — tracked here to close the held-but-no-forecast gap.

Source: Hafrok · hafrok.com/markets/lithuania · data as of 3 Nov 2026

Origination ladder

settled rounds → projects
Seabed leaseOfftake awardIntegrated tenderbirth award (colour = round type)no auction award on record (the chapter names how the site originated)offtake / tender winterminated award / cancelledFIDCOD achievedCOD expected (dashed = still to run)on hold
202520252030203020352035NO OFFTAKE AWARD YET — DEVELOPMENT OR SHELVEDCuronian Nord · 700 MW · On Hold · outlook: Fragile · Rounds: lt-site-1-2023Curonian Nord—700 MW

Source: Hafrok · hafrok.com/markets/lithuania · data as of 3 Nov 2026

Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.