Khai Long (Ca Mau 1)
Status
Proposedlifecycle stage
Ownership
BCBCG Energy ◆
Location
South China Sea
Technology
Capacity
300 MW ◇
Turbines
—
Foundation
—
Site & conditions
Site rights
Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth
1–11 m ≈
Wind speed
6.3 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Not taken
COD · developer
—
Delivery outlook not forecast
We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.
Revenue & offtake route to market — open
No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
1/9 fields verified · rests on 5 sources
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[1]
[2]
[3]
[4]
VietnamPlus (Vietnam News Agency)2026-07-02
“The project, invested by BCG Energy through the BCG – Khai Long 1 Wind Power JSC with a total investment of over 6.32 trillion VND (about 240 million USD), has a designed capacity of 100 MW.”
supportsowner
[6]