Bac Lieu Nearshore Wind Farm

Nearshore/intertidal project in very shallow water (1-6m). Located on the East Dam reclamation area. Phase 3 (155 MW Goldwind) under construction.

Project timeline verified milestones only — each date carries its provenance mark

2016’17’18’19’20’21’22’23’24’25’26View the source for Commercial operationCommercial operation 2016-Q1
Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime: Vietnam EVN FIT (government fixed tariff)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2016-Q1

Sources & verification

2/14 fields verified · rests on 6 sources
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Trade press5
[2]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsoperatorMechanismDetail
[3]
power-technology2025
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionCommercial operationSite rightsTurbines+5 more
[4]
Global Energy Monitor2026-07-02
supportsCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityWater depth+1 more