Stromar
ScotWind Floating. Moray Firth, ~50km from Port of Wick. Could power ~1.5 million homes.
Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
Nadara — 100% ◆Location
North Sea
Technology
Capacity
1,500 MW ◆
Turbines
—
Foundation
Floating ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
ScotWind Leasing · 2022 ·
Water depth
76–93 m ≈
Distance from shore
50 km ◇
Wind speed
10.8 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
Applied ◆
Connection
Greens 400kV Substation — NESO TEC register entry at Scoping … ◆
Schedule
FID
Not taken
COD · announced
2033 ○
COD · Hafrok
2034 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2034
expected year of commercial operation
The developer says 2033; Hafrok expects 2034 — 1 year later.
Chance of delivery
≈52%
estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2033 | 14.1% |
| 2034 (expected) | 28.0% |
| 2035 | 22.7% |
| 2036 | 14.6% |
| 2037 | 8.7% |
| 2038 | 5.1% |
| 2039 | 3.1% |
| 2040 | 1.8% |
| 2041 | 1.1% |
| 2042 | 0.7% |
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (
2026), adds the time similar projects (floating, in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before
2034 is not credible.3
Still needs an offtake award: UK-CFD-AR8
The project has no offtake contract yet. The next visible auction is around
2026 Q4; winners typically reach final investment decision about 2 years after an award (2028 Q4), then build time on top gives 2032 Q4. The milestone timing is already later than that, so it stands.4
Result
Expected commercial operation
2034, likely range 2034–2040 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈52%, which rates it
Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2022-01
ScotWind Leasing
- Awarded to
- Falck Renewables
- Basis
- seabed award
From the auction results — the round that created the project.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake route to market — open
No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
CfD allocation round
The UK's principal route — a 15-year, CPI-indexed, two-sided CfD awarded in annual competitive rounds.
Next visible round · from the auction calendar
CfD Allocation Round 8 ◇
AR8 confirmed (gov update, Mar 2026) to OPEN July 2026 — brought forward from the earlier mid/late-2026 expectation
Corporate PPA
Bilateral long-term offtake with corporate buyers; can cover part of output alongside or ahead of a CfD.
Merchant
Uncontracted sale into the wholesale market — no price floor, full exposure to power prices.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2033
Sources & verification
4/12 fields verified · rests on 12 sources (8 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[4]
Marine Scotland / Scottish Government2024-04-29◆ Cenos s36 application (Marine Directorat…
“Application reference: SCOP-0039, submitted 10 January 2024 by Stromar Offshore Wind Farm Limited; scoping opinion issued 29 April 2024. Stage: pre-application.”
supportsConsent
[16]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Stromar Offshore Wind Farm" (key node/24186): Application stage "Pre-application", type "Renewables - Wind".”
supportsRegister entry
Operator3
[3]
NESO2026-06-12◆ NESO Transmission Entry Capacity (TEC) R…
“Stromar Offshore Windfarm,Stromar Offshore Wind Farm Limited,Greens 400kV Substation,2,0,500,1500,31/12/2035,Scoping,Direct Connection,SHET,Wind Offshore,a1fJ9000000Gz3dIAC,PRO-001530-2,”
supportsStatusConnection point
[7]
Stromar Offshore Wind Farm / Nadara2026-06-15
“Led by Nadara (formerly Renantis). Up to 1.5GW of electricity generation potential. 50km offshore near Caithness in northern Scotland, in water depths of 60-100m.”
supportsTotal capacity
[15]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-001530-1: "Stromar Offshore Windfarm", Status "Scoping", MW Connected 0, Effective From 2033-10-31, Customer "Stromar Offshore Wind Farm Limited"; PRO-001…”
supportsRegister entry
Auction pipeline1
[17]
DESNZ (gov.uk)2026◆ govuk-cfd-ar8
gov.uk AR8 collection — Allocation Framework, statutory framework and CIB documents published ahead of the round.
supportsCfD Allocation Round 8
Trade press5
[10]
[11]
[12]
[13]
Construction Review Online2026-03-27
“Orsted and BlueFloat Energy have exited the Stromar floating offshore wind project, leaving Nadara as the sole owner. With Nadara now in full control, Stromar floating offshore wind project is expecte…”
supportsowner
[14]
Unverified import1
[1]
unknown
supportsCommercial operationTotal capacityFoundationWater depthDistance from shore+1 more