Robin Rigg
Scotland's first offshore wind farm. Straddles England/Scotland border in Solway Firth. Round 2 development.
Technology
Capacity
174 MW ◆
Turbines
58 × 3 MW ◆
Model
Vestas V90 3-0 ◆
Foundation
Monopile ◆
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 1 · 2001 ·
Water depth
5–18 m ◆
Distance from shore
10 km ◆
Wind speed
9.3 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ∅
Grid
Secured · 2010-04 ◆
Connection
Seaton substation, Cumbria, 132 kV (OFTO: TC Robin Rigg OFTO … ◆
Schedule
FID
Taken · date not recorded ∴
COD
Apr 2010 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2001-04
Crown Estate Round 1
- Awarded to
- E.ON
- Basis
- seabed award
From the auction results — the round that created the project.
Merger · 2018-03
E.ON → RWE 100%
- Stake
- 100%
- Consideration
- not disclosed
- Announced
- 2018-03
- Closed
- 2019-10
- Project stage
- operational
Robin Rigg transferred from E.ON to RWE as part of the E.ON/RWE/innogy corporate restructuring. Same transaction as Humber Gateway and Scroby Sands. Not an arm's-length transaction. RWE 100% from October 2019.
Evidence
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2010-Q2→2010-04 · 2 recorded revisions · held (announced 2010-Q2, unchanged)
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeROC (banding uncertain — likely 1.5 ROC/MWh; first power Sep 2009)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing59≈58 turbines + 2 platforms expected · 1 fewer than expected — a position the survey missed
Surveyed2026-09-01≈from 119 satellite passes
Built2008 → 2010-04offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07≈Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%≈the whole farm lies inside the image
Structures ringed59 confirmed · 0 not yet confirmed≈as counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Workington ◆operations maintenance
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (59)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary

Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 2
Offshore substationRobin Rigg East offshore substation platform·under construction · owner E.ON Climate & Renewables (UK) Ltd at construction; today RWE Renewables UK Robin Rigg East Limited. THE PLATFORM WAS NOT SOLD TO THE OFTO — it was excluded from the transfer perimeter and retained by the generator. This is the exception in the British fleet, so the usual "the current owner is the OFTO" shortcut fails here.
Offshore substationRobin Rigg West offshore substation platform·under construction · owner E.ON Climate & Renewables (UK) Ltd at construction; today RWE Renewables UK Robin Rigg West Limited. Excluded from the OFTO transfer, as above.
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
Sources & verification
14/18 fields verified · rests on 13 sources (8 primary) · ◆ 10 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[2]
Scottish Executive / Marine Scotland2003◆ Robin Rigg Offshore Windfarm - Section 3…
“The Scottish Ministers, pursuant to section 36 of the Electricity Act 1989, hereby consent to the construction and operation by Offshore Energy Resources Ltd and Solway Offshore Limited [...] of a win…”
supportsBackground
[13]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2496: Site Name "Robin Rigg East", Development Status "Operational", Installed Capacity 84 MWelec, Operator "E.ON UK"; Ref ID 2497: Site Name "Robin Rigg West",…”
supportsRegister entry
[15]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Robin Rigg Offshore Windfarm" (key ml/robin-rigg-offshore-windfarm): Application stage "Post-consent", type "Renewables - Wind".”
supportsRegister entry
Operator4
[1]
[3]
E.ON Climate & Renewables / BVG Associates2012-07◆ Robin Rigg East And West Operation Maint…
“Robin Rigg is located in the Solway Firth, off the west coast of Scotland and close to the north coast of Cumbria, where its operational base (Workington) and grid connection (Seaton) are located. The…”
supportsFinal investment decisionCommercial operationCOD historyModelUnit capacity+3 more
[9]
[14]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000194: "Robin Rigg East Offshore Wind Farm", Status "Built", MW Connected 86, Effective From n/a, Customer "RWE RENEWABLES UK ROBIN RIGG EAST LIMITED"; P…”
supportsRegister entry
Trade press6
[4]
Solway Shore-walker (E.ON-approved content per article)2016-02-22◆ What’s been happening at Robin Rigg? An …
“Why was she at Robin Rigg? To decommission two of the turbines, A1 and B1 [...] 'After the storms of winter 2013/14 there was an effect on the channel causing it to move. We made a proactive decision …”
supportsTurbines
[5]
Transmission Investment2021◆ Robin Rigg - Transmission Investment
“The Robin Rigg offshore transmission assets connect the 174MW Robin Rigg offshore windfarm to the 132kV electricity distribution network at Seaton substation in Cumbria. The 132kV export cable route i…”
supportsTotal capacityDistance from shore
[8]
Power Technology (GlobalData)2023◆ Robin Rigg Offshore Wind Farm, United Ki…
Press report — cited, not quoted; read it at the source link.
supportsConsentOnshore constructionOffshore constructionFoundationWater depth+1 more
[10]
[11]
BBC News2009-09-09
Press report — cited, not quoted; read it at the source link.
supportsFirst power