Levenmouth Demonstration Turbine
Levenmouth / Methil demonstration turbine (ex-Samsung 7 MW prototype), Fife; operated by ORE Catapult.
Status
Operationallifecycle stage
Ownership
OCORE Catapult — 100% ◇
Location
North Sea
Technology
Capacity
7 MW ◇
Turbines
1 × 7 MW ◇
Model
Samsung S7 0-171 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
10–14 m ≈
Distance from shore
0.05 km ◇
Wind speed
8.1 m/s @ 100 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Taken · date not recorded ∴
COD
2016 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime not on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2016
Sources & verification
0/13 fields verified · rests on 7 sources (2 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[6]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2528: Site Name "Levenmouth demonstration turbine (Fife Energy Park)", Development Status "Operational", Installed Capacity 7 MWelec, Operator "Catapult"”
supportsRegister entry
[7]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Levenmouth Demonstration Turbine" (key ml/levenmouth-demonstration-turbine): Application stage "Post-consent", type "Renewables - Wind".”
supportsRegister entry
Operator1
[1]
4C Offshore2016
Press report — cited, not quoted; read it at the source link.
supportsownerConsentFinal investment decisionCommercial operationSite rights+1 more
Trade press3
[3]
[4]
[5]
Encyclopaedic1
[2]