Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2004’05’06’07’08’09’10’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26Crown Estate Round 2 — awarded to RWECrown Estate Round 2 Dec 2003 · auction recordView the source for Consent grantedConsent granted 3 Dec 2008 View the source for Onshore constructionOnshore construction Nov 2009 View the source for Final investment decisionFinal investment decision Jun 2010 View the source for Offshore constructionOffshore construction Apr 2012 View the source for First powerFirst power 2013-Q3 View the source for Commercial operationCommercial operation 2015-Q2 Crown Estate Round 2 — awarded to RWE 2003-12 ORIGINATIONRWE → UK Green Investment Bank — 10% · €273m · closed 2015-10 2014-03 FARMDOWNTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDSiemens AG → Macquarie — 10% 2019-10 Transfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYRWE — 50% today · operator RWE RWE 50%UK Green Investment Bank UK Green Investment Bank UK Green Investment Bank exited 2014-03Siemens AG Siemens AG Siemens AG exited 2019-10Macquarie GIG — 20% today Macquarie Macquarie 20%Stadtwerke München — 30% today Stadtwerke München Stadtwerke München 30%Crown Estate Round 2 — awarded to RWE RWE → UK Green Investment Bank — 10% · €273m · closed 2015-10 10%Transfer(s) not in Hafrok's record — shown as a gap, never guessed. Siemens AG → Macquarie — 10% 10%Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 2015-Q22015-Q2 · 2 recorded revisions · held (announced 2015-Q2, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime on record
RegimeROC (offshore wind, 2 ROCs/MWh — rate to be confirmed against primary source)
Instrumentgreen certificates
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite survey
the farm as it stands, counted from satellite radar images · built before the count began, so there is no build to chart
Satellite survey
Structures standing159160 turbines + 1 platform expected · 2 fewer than expected — a position the survey missed
Surveyed2026-09-01from 119 satellite passes
Built2012-04 → 2015-Q2offshore construction to start of operation, from the record
Hafrok counts the structures standing in the sea from satellite radar images (≈) and reads the count against the turbines and platforms on record. The farm was built before this count began, so the images show it complete; they cannot date its construction. Rows marked with a dot (·) come from Hafrok’s own registers.
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, southbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed159 confirmed · 0 not yet confirmedas counted on 2026-09-01 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Mostyn O&M base
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (159)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Gwynt y Mor, 2026-09-07
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationGwynt y Mor offshore substations (2, described collectively)·33/132 kV · owner Gwynt y Mor OFTO (see notes); built by RWE-led Gwynt y Mor Offshore Wind Farm Ltd

Sources & verification

16/18 fields verified · rests on 10 sources (7 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator3
[2]
Ofgem2010-11◆ Gwynt y Mor Offshore Transmission Assets…
“All necessary offshore consents and licences are in place for the construction of the Transmission Assets. These include Electricity Act (1989) Section 36 and Coastal Protection Act (1949) consents an…”
supportsOnshore constructionOffshore constructionStatusConnection point
[4]
Ofgem2015-02-12◆ Ofgem grants licence for £352 million Gw…
“The offshore wind farm comprises 160 Siemens 3.6MW turbines with a maximum installed capacity of 576MW, positioned approximately 8 miles off the North Wales coast in Liverpool Bay.”
supportsModel
[11]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2543: Site Name "Gwynt y Mor", Development Status "Operational", Installed Capacity 576 MWelec, Operator "RWE"”
supportsRegister entry
Operator4
[1]
RWE AG2025-07-07◆ Wales’s largest Offshore Wind Farm, Gwyn…
“At 576 megawatts (MW) installed capacity, Gwynt y Môr is currently the largest operating renewable energy project in Wales and, at the time of its inauguration in June 2015, was the second largest off…”
supportsCommercial operationCOD historyTurbinesUnit capacityTotal capacity+1 more
[3]
RWE (UK)2025◆ Gwynt y Môr offshore wind farm
“Gwynt y Môr Offshore Wind Farm Limited is an Unincorporated Joint Venture between RWE (50% shareholder), Stadtwerke München GmbH (30% shareholder) and Macquarie GIG (20% shareholder). [...] Commission…”
supportsDistance from shoreCoordinates
[8]
RWE2024◆ Gwynt y Môr offshore wind farm
supportsoperatorowner
[12]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-000208: "Gwynt Y Mor Offshore Wind Farm", Status "Built", MW Connected 574, Effective From n/a, Customer "GWYNT Y MOR OFFSHORE WIND FARM LIMITED"”
supportsRegister entry
OEM1
[9]
Siemens2010-06-04
“RWE Innogy, Stadtwerke München and Siemens have entered into a joint venture to build the offshore wind farm Gwynt y Môr (Welsh for 'wind in the sea'). ... The total investment amounts to more than tw…”
supportsFinal investment decision
Trade press2
[5]
Power Technology2015
Press report — cited, not quoted; read it at the source link.
supportsConsentFirst powerModelFoundationWater depth+1 more
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026