Gwynt Glas

Crown Estate Round 5. EDF-ESB joint venture. Off South Wales/SW England. Part of 4.5GW Celtic Sea floating program.

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
EUEDF Renewables UK — 33.33% 
ESB — 33.33% 
SCSumitomo Corporation — 33.33% 
Location
United Kingdom
Celtic Sea
Technology
Capacity 1,500 MW 
Turbines
Foundation Floating 
Site & conditions
Site rights Seabed rights held 
Origination Crown Estate Round 5 · 2025 ·
Water depth 70–83 m  Distance from shore 40 km  Wind speed 10.1 m/s @ 150 m 
Revenue & grid
Offtake
Grid Applied  Connection Alverdiscott 400kV Substation 
Schedule
FID Not taken
COD · guidance 2037 
COD · Hafrok 2037 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2037
expected year of commercial operation
Chance of delivery
≈52% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal) · the developer’s COD guidance, by date stated (ink)
20%40%60%80%100% 2036: 14.1% (conditional on completion) 2037: 28.0% (conditional on completion) 2038: 22.7% (conditional on completion) 2039: 14.6% (conditional on completion) 2040: 8.7% (conditional on completion) 2041: 5.1% (conditional on completion) 2042: 3.1% (conditional on completion) 2043: 1.8% (conditional on completion) 2044: 1.1% (conditional on completion) 2045: 0.7% (conditional on completion)2026now20282030203220342036203728%2038204020422044 Developer-announced COD: 2037 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2037developer cod guidance2026-04-15: the developer guided 2035 — source [2] — click for it2026-042035 [2]2026-08-10: the developer guided 2037 — source [8] — click for it2026-082037 [8]
COD probability by year, conditional on completion
YearProbability
203614.1%
2037 (expected)28.0%
203822.7%
203914.6%
20408.7%
20415.1%
20423.1%
20431.8%
20441.1%
20450.7%
Developer COD guidance, by the date it was stated
StatedAnnounced COD
2026-04-152035
2026-08-102037
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (floating, in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2034 is not credible.
3
Still needs an offtake award: UK-CFD-AR8
The project has no offtake contract yet. The next visible auction is around 2026 Q4; winners typically reach final investment decision about 2 years after an award (2028 Q4), then build time on top gives 2032 Q4. The milestone timing is already later than that, so it stands.
4
Result
Expected commercial operation 2037, likely range 2037–2043 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈52%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2026’27’28’29’30’31’32’33’34’35’36’37Developer-announced COD: 2037 announced COD 2037Crown Estate Round 5 — awarded to Gwynt Glas — EDF + ESB joint ventureCrown Estate Round 5 Jun 2025 · auction recordCommercial operation 2037 ·Hafrok expectedCrown Estate Round 5 — awarded to Gwynt Glas — EDF + ESB joint venture 2025-06 ORIGINATIONEDF Renewables UK, ESB, Reventus Power — stake not disclosed 2024-04-10 JV FORMATION — 33.33% · closed 2026-08 2026-08-10 JV ENTRYTODAYGwynt Glas — EDF + ESB joint venture Gwynt Glas — EDF + ESB … Gwynt Glas — EDF + ESB … exited 2025-06EDF Renewables UK — 33.33% today EDF Renewables UK EDF Renewables UK 33.33%ESB — 33.33% today ESB ESB 33.33%Reventus Power Reventus Power Reventus Power exited 2024-04-10Sumitomo Corporation — 33.33% today Sumitomo Corporation Sumitomo Corporation 33.33%Crown Estate Round 5 — awarded to Gwynt Glas — EDF + ESB joint venture EDF Renewables UK, ESB, Reventus Power — stake not disclosed
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced COD: slipped so far +2.0 yr (first announced 2035) · the full guidance history is in the delivery chart above

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
CfD allocation round
The UK's principal route — a 15-year, CPI-indexed, two-sided CfD awarded in annual competitive rounds.
Next visible round · from the auction calendar
CfD Allocation Round 8
expected H2 2026 · scheduled · the round’s published documents do not name this project
AR8 confirmed (gov update, Mar 2026) to OPEN July 2026 — brought forward from the earlier mid/late-2026 expectation
Corporate PPA
Bilateral long-term offtake with corporate buyers; can cover part of output alongside or ahead of a CfD.
Merchant
Uncontracted sale into the wholesale market — no price floor, full exposure to power prices.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2037

Sources & verification

8/12 fields verified · rests on 12 sources (9 primary) · ◆ 8 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
The Planning Inspectorate (PINS)2026-08-23◆ PINS national infrastructure application…
“Project reference EN0110036: "Gwynt Glas Offshore Wind Farm"; applicant "Gwynt Glas Offshore Wind Farm Limited"; Stage "Pre-application"; anticipated submission September 2028.”
supportsRegister entry
Operator8
[1]
The Crown Estate2025-06-19
“19 June 2025: Equinor and Gwynt Glas (EDF Renewables/ESB joint venture) selected as preferred bidders for two sites”
supportsConsent
[2]
The Crown Estate2025-10-07◆ Celtic Sea Round 5 - Equinor + Gwynt Gla…
“Equinor and Gwynt Glas enter agreements for lease for floating wind farms [signed 7 October 2025]. Both projects aim to be operational by the mid-2030s and could support over 5,000 new jobs across the…”
supportsCommercial operation
[3]
EDF Renewables UK2025-06-18◆ Gwynt Glas secures site in The Crown Est…
“EDF Renewables UK and ESB have formed a 50:50 joint venture company to develop Gwynt Glas together. The project has the potential to generate up to 1,500 MW of clean renewable energy. Gwynt Glas is a …”
supportsTotal capacityFoundation
[4]
Gwynt Glas (EDF Renewables UK / ESB JV)2026-06
“EDF power solutions and ESB have entered into a partnership to develop Gwynt Glas Floating Offshore Wind Farm. DP Energy serves as exclusive development partner.”
supportsFoundation
[5]
NESO2026-06-12◆ NESO Transmission Entry Capacity (TEC) R…
“Gwynt Glas Offshore Wind Farm 2,GWYNT GLAS OFFSHORE WIND FARM LIMITED, Alverdiscott 400kV Substation,,0,1000,1000,06/12/2036,Scoping, Direct Connection,NGET,Wind Offshore,a1f8e0000008T5uAAE,PRO-002480…”
supportsStatusConnection point
[8]
Sumitomo Corporation2026-08-10◆ Sumitomo Corporation joins Gwynt Glas fl…
“Sumitomo Corporation (Head Office: Chiyoda-ku, Tokyo; Representative Director, President and CEO: Shingo Ueno) is delighted to announce the acquisition of a 33.3% equity interest in the Gwynt Glas Off…”
supportsownerCommercial operationCOD history
[9]
Gwynt Glas Offshore Wind Farm2026-06-26◆ EIA Scoping Report submitted for propose…
“Gwynt Glas Offshore Wind Farm, a pioneering project in the Celtic Sea, has submitted its Environmental Impact Assessment (EIA) Scoping Report to the Planning Inspectorate (PINS) Natural Resources Wale…”
supportsStatus note
[11]
Gwynt Glas Offshore Wind Farm2025-10-07◆ Gwynt glas signs agreement for lease wit…
“The developable area identified by The Crown Estate lies in Welsh waters, located ~40km at the closest point to shore.”
supportsDistance from shore
Auction pipeline1
[13]
DESNZ (gov.uk)2026◆ govuk-cfd-ar8
gov.uk AR8 collection — Allocation Framework, statutory framework and CIB documents published ahead of the round.
supportsCfD Allocation Round 8
Trade press2
[6]
GEBCO Compilation Group2020
supportsWater depth
[7]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed