CampionWind
Located approximately 100 km off the Aberdeenshire coast in water depths averaging 77 m. ScotWind Round 1 lease awarded January 2022 to ScottishPower/Shell JV.
Status
Cancelledlifecycle stage
Ownership
CLCampionWind Limited — 100% ◆
Location
North Sea
Technology
Capacity
2,000 MW ◇
Turbines
—
Foundation
Floating ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
ScotWind Leasing · 2022 ·
Water depth
77–77 m ◇
Distance from shore
100 km ◇
Wind speed
10.6 m/s @ 150 m ≈
Revenue & grid
Offtake
Other project cancelled ◇
Grid
Not recorded ◇
Connection
N/A ◇
Schedule
COD
—
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
1/15 fields verified · rests on 7 sources (2 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[7]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "CampionWind Offshore Wind Farm" (key node/26244): Application stage "Pre-application", type "Renewables - Wind".”
supportsRegister entry
Operator1
[3]
Jones Day2025-11
“Shell owns the entire issued share capital of CampionWind Limited.”
supportsowner
Trade press5
[1]
Offshore Wind Business Journal (offshorewind.biz)2025-11-11◆ Shell Confirms MarramWind Project Exit, …
Press report — cited, not quoted; read it at the source link.
supportsConsentTotal capacityMechanismDetailStatus+2 more
[2]
Offshore Wind Business Journal (offshorewind.biz)2022-01-18◆ Scotland's New Floating Wind Projects – …
Press report — cited, not quoted; read it at the source link.
supportsFoundationWater depthDistance from shore
[4]
Rigzone (Bloomberg wire)2025-11-10
“The companies swapped stakes in the projects, leaving Shell as the sole owner of the CampionWind project. ... It subsequently returned the lease for the wind farm to Crown Estate Scotland, according t…”
supports↳ parent
[5]
[6]