Berwick Bank Phase B

Part of 4.1GW Berwick Bank complex. Located 38km east of Scottish Borders. Could create 9,300 jobs at peak construction.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
SSE Renewables — 100% 
Location
United Kingdom
North Sea
Technology
Capacity 1,380 MW 
Turbines
Foundation Jacket 
Site & conditions
Site rights Seabed rights held 
Origination Crown Estate Round 3 · 2010 ·
Water depth 41–62 m  Distance from shore 38 km  Wind speed 10.5 m/s @ 150 m 
Revenue & grid
Offtake CfD · AR7 · £89.49/MWh  Grid Secured  Connection Branxton, East Lothian and Blyth, Northumberland — two secured … 
Schedule
FID Not taken
COD · announced 2031 
COD · Hafrok 2031 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2031
expected year of commercial operation
Chance of delivery
≈84% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract puts this one well above that; its size and technical complexity weigh only slightly against it.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2030: 3.9% (conditional on completion) 2031: 50.2% (conditional on completion) 2032: 29.5% (conditional on completion) 2033: 10.6% (conditional on completion) 2034: 3.8% (conditional on completion) 2035: 1.4% (conditional on completion) 2036: 0.6% (conditional on completion)2026now2027202820292030203150%20322033203420352036 Developer-announced COD: 2031 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2031
COD probability by year, conditional on completion
YearProbability
20303.9%
2031 (expected)50.2%
203229.5%
203310.6%
20343.8%
20351.4%
20360.6%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2025. From there Hafrok adds how long similar projects (in established offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2029; the faster quarter of similar projects would be done by 2027, the slower quarter not until 2030.
3
Result
Expected commercial operation 2031, likely range 2027–2030 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈84%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2010’11’12’13’14’15’16’17’18’19’20’21’22’23’24’25’26’27’28’29’30’31Developer-announced COD: 2031 announced COD 2031Crown Estate Round 3 — awarded to Seagreen Wind Energy (SSE + Fluor)Crown Estate Round 3 Jan 2010 · auction recordView the source for Consent grantedConsent granted 31 Jul 2025 Commercial operation 2031 ·Hafrok expectedCrown Estate Round 3 — awarded to Seagreen Wind Energy (SSE + Fluor) 2010-01 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYSeagreen Wind Energy (SSE + Fluor) Seagreen Wind Energy Seagreen Wind Energy not among today’s recorded owners — no sale recordedSSE Renewables — 100% today · operator SSE Renewables SSE Renewables 100%Crown Estate Round 3 — awarded to Seagreen Wind Energy (SSE + Fluor) Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

CfD-backed offtake
CfD · AR7
Price£64.23/MWh ·
Basis2012 real · CPI-indexed
Capacity1,380 MWAwardedJan 2026
Term20 yrs · delivery 2030/31
Money-of-the-day values computed by Hafrok from the United Kingdom CPI index, 2012 real base — actual to 2026-07, then an assumed +2.0%/yr (central-bank target). Cfd terms run 20 years from start of generation in the contracted delivery year.
Contract price over time · £/MWh
solid = actual CPI indexation · dashed = assumed +2.0%/yr
CfD · AR7
50100150nowCfD · AR7 — £64.23/MWh · 2012 real · CPI-indexed · assumed indexationCfD · AR7 term · 20 yrs2026203020342038204220462050CfD · AR7 — £64.23/MWh · 2012 real · CPI-indexed£64.23/MWh · 2012 real · CPI-indexed

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2031
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
HVDC systemBerwick Bank Cambois HVDC·1800 MW · ±320 kV · planned, expected 2031
Export & onshore
Onshore connectionBranxton Substation (Berwick Bank / EGL1)·400 kV · consented · also serves Morven (North & South)
Onshore connectionCambois Converter Station (Berwick Bank)·400 kV · consented · also serves Berwick Bank (Remaining Phases)
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) and the year Hafrok expects (teal band) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
202620272028202920302031Hafrok expects the farm to start in 2031developer’s stated start 2031nowBerwick Bank Cambois HVDCBerwick Bank Cambois HVDCexpected 2031expected 2031Branxton Substation (Berwick Bank / EGL1)Branxton Substation (Berwick Bank…Cambois Converter Station (Berwick Bank)Cambois Converter Station (Berwic…expected 2031expected 2031

Sources & verification

6/13 fields verified · rests on 14 sources (5 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator4
[3]
DESNZ2026-01◆ Contracts for Difference Allocation Roun…
“Berwick Bank Phase B NT730745 Scotland BERWICK BANK B LIMITED Offshore Wind-Scotland 1380.00 64.23 89.49 2030/31 3 3”
supportsCommercial operationTotal capacityMechanismStrike / priceDetail
[4]
Marine Scotland2025-07-31◆ Berwick Bank s36 consent decision (Marin…
“Section 36 Consent - Construction and Operation of Generating Station - Berwick Bank Offshore Wind Farm - Firth of Forth. Environmental Impact Assessment Decision Notice - Generating Station - Berwick…”
supportsConsentConsent granted
[13]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 9873: Site Name "Berwick Bank Offshore Wind Farm", Development Status "Awaiting Construction", Installed Capacity 4100 MWelec, Operator "Scottish Southern Energ…”
supportsRegister entry
[15]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Berwick Bank Wind Farm" (key ml/berwick-bank-offshore-wind-farm): Application stage "Application", type "Renewables - Wind".”
supportsRegister entry
Operator3
[6]
Berwick Bank Wind Farm (SSE Renewables)2026-06-15
“We have secured a grid connection at Branxton, near Torness, in East Lothian.”
supportsStatusConnection point
[8]
SSE Renewables2026-01◆ Berwick Bank | SSE Renewables
supportsoperator
[14]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-002628-1: "Berwick Bank Offshore Wind Farm B", Status "Scoping", MW Connected 0, Effective From 2029-10-31, Customer "Berwick Bank B Limited"; PRO-002628-…”
supportsRegister entry
Auction results1
[16]
DESNZ (gov.uk)2026-01◆ cfd-ar7-results-2026
Offshore Wind (Pot 3) cleared GBP 65.45 (2012) / 91.20 (2024): Awel y Môr A 775.00 MW; Dogger Bank South East/West Unit A 1,500.00 MW each; Norfolk Vanguard East A 1,380 / B 90 / C 75 MW; Norfolk Vang…
supportsCfD · AR7
Trade press4
[7]
Berwick Bank Wind Farm Ltd (EIA Application)2022
“considering both piled and suction caisson foundation options, along with options for transportation and installation of the jacket substructures.”
supportsFoundation
[10]
Global Energy Monitor2026-07-02
supportsCoordinates
[11]
GEBCO Compilation Group2020
supportsWater depth
[12]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTotal capacityFoundationWater depthDistance from shoreCoordinates
Encyclopaedic1
[9]
Wikipedia2026
supportsTotal capacityDistance from shore