Bellrock

ScotWind Floating. 1.8 GW project 120km east of Stonehaven. BlueFloat Energy exited November 2025; Nadara now 100% owner.

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
Nadara — 100% 
Location
United Kingdom
North Sea
Technology
Capacity 1,800 MW 
Turbines
Foundation Floating 
Site & conditions
Site rights Seabed rights held 
Origination ScotWind Leasing · 2022 ·
Water depth 63–99 m  Distance from shore 120 km  Wind speed 10.7 m/s @ 150 m 
Revenue & grid
Offtake
Grid Applied  Connection Hurlie 400kV substation — NESO TEC register entry at Scoping … 
Schedule
FID Not taken
COD · announced 2037 
COD · Hafrok 2037 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2037
expected year of commercial operation
Chance of delivery
≈52% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2036: 14.1% (conditional on completion) 2037: 28.0% (conditional on completion) 2038: 22.7% (conditional on completion) 2039: 14.6% (conditional on completion) 2040: 8.7% (conditional on completion) 2041: 5.1% (conditional on completion) 2042: 3.1% (conditional on completion) 2043: 1.8% (conditional on completion) 2044: 1.1% (conditional on completion) 2045: 0.7% (conditional on completion)2026now20282030203220342036203728%2038204020422044 Developer-announced COD: 2037 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2037
COD probability by year, conditional on completion
YearProbability
203614.1%
2037 (expected)28.0%
203822.7%
203914.6%
20408.7%
20415.1%
20423.1%
20431.8%
20441.1%
20450.7%
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (floating, in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2034 is not credible.
3
Still needs an offtake award: UK-CFD-AR8
The project has no offtake contract yet. The next visible auction is around 2026 Q4; winners typically reach final investment decision about 2 years after an award (2028 Q4), then build time on top gives 2032 Q4. The milestone timing is already later than that, so it stands.
4
Result
Expected commercial operation 2037, likely range 2037–2043 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈52%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2022’23’24’25’26’27’28’29’30’31’32’33’34’35’36’37Developer-announced COD: 2037 announced COD 2037ScotWind Leasing — awarded to Falck RenewablesScotWind Leasing Jan 2022 · auction recordView the source for Consent appliedConsent applied 21 Apr 2026 Commercial operation 2037 ·Hafrok expectedScotWind Leasing — awarded to Falck Renewables 2022-01 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYFalck Renewables Falck Renewables Falck Renewables not among today’s recorded owners — no sale recordedNadara — 100% today · operator Nadara Nadara 100%ScotWind Leasing — awarded to Falck Renewables Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake route to market — open

No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
CfD allocation round
The UK's principal route — a 15-year, CPI-indexed, two-sided CfD awarded in annual competitive rounds.
Next visible round · from the auction calendar
CfD Allocation Round 8
expected H2 2026 · scheduled · the round’s published documents do not name this project
AR8 confirmed (gov update, Mar 2026) to OPEN July 2026 — brought forward from the earlier mid/late-2026 expectation
Corporate PPA
Bilateral long-term offtake with corporate buyers; can cover part of output alongside or ahead of a CfD.
Merchant
Uncontracted sale into the wholesale market — no price floor, full exposure to power prices.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2037

Sources & verification

4/12 fields verified · rests on 14 sources (4 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[13]
Scottish Government Marine Directorate (MD-LOT)2026-08-23◆ Scottish MD-LOT marine projects register…
“Register row "Bellrock Offshore Wind Farm" (key node/25039): Application stage "Pre-application", type "Renewables - Wind".”
supportsRegister entry
Operator5
[3]
NESO2026-06-12◆ NESO Transmission Entry Capacity (TEC) R…
“Bellrock Offshore Wind Farm,Bellrock Offshore Wind Farm Limited,Hurlie 400kV substation,2,0,600,1800,31/10/2035,Scoping,Direct Connection,SHET,Wind Offshore,a1fJ9000000H1mNIAS,PRO-001496-2,”
supportsStatusConnection point
[4]
Bellrock Offshore Wind Farm Limited / Nadara2026-04-21◆ Consent applications submitted for 1.8 G…
"The developer of the Bellrock Offshore Wind Farm has submitted Section 36 Consent and Marine Licence applications to Scottish Ministers for the project's Wind Farm Development Area." "Bellrock Offsho…
supportsConsentTotal capacityConsent applied
[7]
Bellrock (Nadara2026
supportsTotal capacityDistance from shore
[12]
National Energy System Operator (NESO)2026-07-21◆ NESO Transmission Entry Capacity (TEC) R…
“NESO TEC Register, edition 21 July 2026 - PRO-001496-1: "Bellrock Offshore Wind Farm", Status "Scoping", MW Connected 0, Effective From 2032-10-31, Customer "Bellrock Offshore Wind Farm Limited"; PRO-…”
supportsRegister entry
[14]
Bellrock Offshore Wind Farm Ltd (Nadara)2026-09-01◆ Scoping Report - Offshore Transmission D…
“Published: 01/09/2026. Nadara has submitted a comprehensive Scoping Report and Habitats Regulations Appraisal (HRA) Screening Report to the Marine Directorate, for the offshore transmission infrastruc…”
supportsStatus note
Auction pipeline1
[15]
DESNZ (gov.uk)2026◆ govuk-cfd-ar8
gov.uk AR8 collection — Allocation Framework, statutory framework and CIB documents published ahead of the round.
supportsCfD Allocation Round 8
Trade press6
[5]
Enerdata2026-04
Press report — cited, not quoted; read it at the source link.
supportsCommercial operation
[6]
Offshore Wind (offshorewind.biz)2025-11-28◆ Nadara acquires BlueFloat JV stakes in 1…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[8]
Global Energy Monitor2025
supportsFoundation
[9]
GEBCO Compilation Group2020
supportsWater depth
[10]
Crown Estate Scotland (open data, ArcGIS)2026-04-17
supportsCoordinates
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTotal capacityFoundationWater depthDistance from shore