Atlantic Array
Located in the Bristol Channel approximately 15 km off north Devon coast and 22 km off the South Wales coast, close to Lundy Island.
Status
Cancelledlifecycle stage
Ownership
RNRWE Npower Renewables — 100% ◆
Location
Bristol Channel
Technology
Capacity
1,200 MW ◇
Turbines
240 ◇
Foundation
Jacket ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
Crown Estate Round 3 · 2010 ·
Water depth
30–70 m ◇
Distance from shore
16 km ◇
Wind speed
9.8 m/s @ 150 m ≈
Revenue & grid
Offtake
Other project cancelled ◇
Grid
No agreement ◇
Connection
N/A ◇
Schedule
COD
—
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
1/16 fields verified · rests on 6 sources (1 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[6]
Department for Energy Security and Net Zero2026-05-06◆ Renewable Energy Planning Database (REPD…
“REPD Q1 2026 quarterly extract — Ref ID 2508: Site Name "Atlantic Array One - Bristol Channel Zone", Development Status "Application Withdrawn", Installed Capacity 1200 MWelec, Operator "Npower"”
supportsRegister entry
Trade press4
[1]
[2]
Renewable Energy World2013-11-26
Press report — cited, not quoted; read it at the source link.
supportsDistance from shore
[4]
offshoreWIND.biz2013-11◆ RWE Terminates Atlantic Array OWF Develo…
Press report — cited, not quoted; read it at the source link.
supportsoperator
[5]
Encyclopaedic1