Zhong Neng
Located 10-17 km off Changhua County. CIP's third Taiwan project. Annual output ~1.1 TWh.
Status
Operationallifecycle stage
Ownership
CSChina Steel Corporation — 51% ◆
CIP — 49% ◆Location
Taiwan Strait
Technology
Capacity
300 MW ◇
Turbines
31 × 9.5 MW ◆
Model
Vestas V174 9-5 ◆
Foundation
Jacket ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
14–38 m ≈
Distance from shore
17 km ◇
Wind speed
10.0 m/s @ 100 m ≈
Revenue & grid
Offtake
PPA ◆
Grid
Not recorded ◆
Connection
Changhua County onshore substation (Taipower grid) ◆
Schedule
FID
Dec 2021 ◆
COD
2025-Q2 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
JV formation · 2021-12
Copenhagen Infrastructure Partners · China Steel Corporation stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2021-12
- Project stage
- pre-FID
Zhong Neng (also referred to as the 298-300 MW Zhong Neng Offshore Wind Farm, located 10-17 km off Changhua County) is a joint venture between Copenhagen Infrastructure Partners (through its fund Copenhagen Infrastructure IV / CI-IV, 49% stake) and China Steel Corporation (CSC, 51% majority owner). CSC is Taiwan's largest steelmaker and a state-linked enterprise. The JV was formed through discussions initiated in 2017, with the project receiving local content plan approval in November 2019. Financial close was achieved in December 2021, with a TWD 45.2 billion green loan (approximately EUR 1.27 billion at 0.028) from a consortium of 20 banks. The 49/51 ownership structure represents a unique model in Taiwan offshore wind — CIP developed the project (as lead developer via Copenhagen Offshore Partners) but CSC holds majority control, reflecting Taiwan's localisation strategy. No equity transfer price was disclosed; the JV was established as a development partnership, not a market sale. COD September 2024. Data confidence: MEDIUM — ownership percentages confirmed; no deal value (JV formation rather than secondary transfer).
Evidence
- offshoreWIND.biz — Financial Close Reached for Zhong Neng Offshore Wind Farm ↗ 2021-12 ◆ held
- nsenergybusiness.com — Zhong Neng Offshore Wind Power Project ↗ 2021-12 ◆ held
- globenewswire.com — Copenhagen Infrastructure Partners inaugurates 300MW Zhong ↗ 2021-12 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
300 MW contracted — feed-in tariff
● Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Priceprice undisclosed ·Capacity300 MWAwardedApr 2018Term20 yrs
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2025-Q2
Offshore construction2023-03 → 2025-Q2
Sources & verification
8/16 fields verified · rests on 12 sources (2 primary) · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
OEM2
[10]
Vestas Wind Systems2022-03-31
“Vestas wins 295 MW order for the Zhong Neng Offshore Wind Project off the coast of Taiwan ... thirty-one Vestas V174-9.5 MW turbines ... the Zhong Neng offshore wind project, located off the coast of …”
supportsTurbinesModelUnit capacity
[11]
Vestas Wind Systems (via PR Newswire APAC)2024-09-05
“Vestas Completes Turbine Installation for Zhong Neng Offshore Wind Farm ... the 31 Vestas V174-9.5 MW turbines have been installed and will contribute 300 MW of clean energy.”
supportsTurbinesModelUnit capacity
Auction results1
[12]
Conventus Law2026-06-22◆ tw-selection-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Trade press8
[2]
Copenhagen Offshore Partners2025-05-22
“May 22, 2025 – Copenhagen, Denmark and Taipei, Taiwan: The Zhong Neng Offshore Wind Farm has reached its Commercial Operations Date (COD) and is now in full-scale operation, delivering a capacity of 3…”
supportsoperatorownerCommercial operationStatusConnection point
[3]
[4]
[5]
[6]
NS Energy2025
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionMechanismDetail
[7]
offshoreWIND.biz2024-09-05
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsFoundation
[8]
Copenhagen Offshore Partners2024-06-26
“26 June, 2024 – Copenhagen, Denmark and Taipei, Taiwan: ... Today it was announced that the Zhong Neng offshore wind farm has achieved a significant milestone and delivered first power.”
supportsFirst power
[9]
Unverified import1
[1]