Zhong Neng

Located 10-17 km off Changhua County. CIP's third Taiwan project. Annual output ~1.1 TWh.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2022’23’24’25’26View the source for Final investment decisionFinal investment decision Dec 2021 View the source for Offshore constructionOffshore construction Mar 2023 View the source for First powerFirst power Jun 2024 View the source for Commercial operationCommercial operation 2025-Q2 Copenhagen Infrastructure Partners, China Steel Corporation — stake not disclosed 2021-12 JV FORMATIONTODAYCIP — 49% today CIP CIP 49%China Steel Corporation — 51% today · operator China Steel Corporation China Steel Corporation 51%Copenhagen Infrastructure Partners, China Steel Corporation — stake not disclosed
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

300 MW contracted — feed-in tariff
Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Priceprice undisclosed ·Capacity300 MWAwardedApr 2018
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2025-Q2
Offshore construction2023-03 → 2025-Q2

Sources & verification

8/16 fields verified · rests on 12 sources (2 primary) · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
OEM2
[10]
Vestas Wind Systems2022-03-31
“Vestas wins 295 MW order for the Zhong Neng Offshore Wind Project off the coast of Taiwan ... thirty-one Vestas V174-9.5 MW turbines ... the Zhong Neng offshore wind project, located off the coast of …”
supportsTurbinesModelUnit capacity
[11]
Vestas Wind Systems (via PR Newswire APAC)2024-09-05
“Vestas Completes Turbine Installation for Zhong Neng Offshore Wind Farm ... the 31 Vestas V174-9.5 MW turbines have been installed and will contribute 300 MW of clean energy.”
supportsTurbinesModelUnit capacity
Auction results1
[12]
Conventus Law2026-06-22◆ tw-selection-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Trade press8
[2]
Copenhagen Offshore Partners2025-05-22
“May 22, 2025 – Copenhagen, Denmark and Taipei, Taiwan: The Zhong Neng Offshore Wind Farm has reached its Commercial Operations Date (COD) and is now in full-scale operation, delivering a capacity of 3…”
supportsoperatorownerCommercial operationStatusConnection point
[3]
Copenhagen Offshore Partners2024
supportsTurbinesTotal capacityDistance from shore
[4]
GEM2026
supportsCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[6]
NS Energy2025
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionMechanismDetail
[7]
offshoreWIND.biz2024-09-05
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionSite rightsFoundation
[8]
Copenhagen Offshore Partners2024-06-26
“26 June, 2024 – Copenhagen, Denmark and Taipei, Taiwan: ... Today it was announced that the Zhong Neng offshore wind farm has achieved a significant milestone and delivered first power.”
supportsFirst power
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTurbinesTotal capacityWater depthDistance from shoreCoordinates