Taipower Changhua Phase 1

Located 8 km off Fangyuan Township, Changhua County. Three-legged jacket foundations.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2013’14’15’16’17’18’19’20’21’22’23’24’25’26Taiwan Offshore Wind Demonstration Incentive Program (示範獎勵) — awarded to Taiwan Power CompanyTaiwan Offshore Wind Demonstration Incentive Program (示範獎勵) Jan 2013 · auction recordView the source for Final investment decisionFinal investment decision 31 Mar 2015 View the source for Consent grantedConsent granted Sep 2015 View the source for Onshore constructionOnshore construction 2018 View the source for Commercial operationCommercial operation 2021 View the source for First powerFirst power 27 Aug 2021 Taiwan Offshore Wind Demonstration Incentive Program (示範獎勵) — awarded to Taiwan Power Company 2013-01 ORIGINATIONTODAYTaiwan Power Company — 100% today · operator Taiwan Power Company Taiwan Power Company 100%Taiwan Offshore Wind Demonstration Incentive Program (示範獎勵) — awarded to Taiwan Power Company
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake the regime the project was built under

Offtake regime: State-owned project; power to Taipower grid
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2021

Sources & verification

4/16 fields verified · rests on 8 sources (1 primary)
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[6]
Chinese Institute of Engineers (中國工程師學會) 工程 journal, co-authored with Taipower Construction Division2025-03
“本計畫於民國 2015 年 3 月 31 日獲行政院核准,計畫場址位於彰化縣芳苑鄉 ... 表1 本計畫分年里程碑時程:計畫奉准 2014 年 12 月 2015 年 3 月;環評審查通過 2015 年 06 月 2015 年 09 月”
supportsConsentFinal investment decisionConsent granted
Trade press6
[2]
reNEWS2021-11
Press report — cited, not quoted; read it at the source link.
supportsoperator
[3]
offshoreWIND.biz2021
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionTurbinesModelUnit capacityTotal capacity+4 more
[4]
GEM2026
“Taipower Offshore wind farm (台電離岸一期, 台電二期離岸風電計畫, 台電離岸二期, 離岸發電第一期計畫, 離岸風力發電第一期計畫, 離岸風電二期計畫) is an operating wind farm in Fangyuan Town, Changhua County, Taiwan.”
supportsCommercial operationStatusConnection pointCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[7]
TechNews 科技新報2021-08-28
“發布日期 2021 年 08 月 28 日 15:40 ... 台電離岸一期風力發電工程共 21 部風機、容量達 109.2 MW,已經成功在 27 日完成初始併聯,接下來將持續進行試運轉及調校,完成測試後接受調度,加入供電行列,預估一年平均可發出約 3.6 億度電,可供電近 9 萬家庭一年用電。”
supportsFirst power
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityFoundation+3 more