Haiding 2

Status
Cancelledlifecycle stage
Ownership
CGCorio Generation — 50% 
TotalEnergies — 50% 
Location
Taiwan
Taiwan Strait
Technology
Capacity 600 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Water depth 14–51 m  Wind speed 11.1 m/s @ 150 m 
Revenue & grid
Offtake
Grid
Schedule
COD

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

1/9 fields verified · rests on 7 sources · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[4]
TotalEnergies2023-02-16
“Corio will remain the majority shareholder and lead developer with 50% plus 10 shares overall in project. (Shareholding table: Haiding 2 — Corio Generation 50.0000481%, TotalEnergies 49.9999519%)”
supportsowner
Trade press6
[1]
Norton Rose Fulbright2024
supportsTotal capacity
[2]
The Wind Power2025
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[3]
GEBCO Compilation Group2020
supportsWater depth
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[7]
Central News Agency (中央社)2026-07-02◆ 離岸風電3-3期調整 經部:解約場址將納擴充容量範圍
Press report — cited, not quoted; read it at the source link.
supportsBackground
[8]
Central News Agency (CNA) Taiwan2026-04-20◆ CNA: EDF terminates Wei Lan Hai Changhua…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity