Haiding 2
Status
Cancelledlifecycle stage
Ownership
CGCorio Generation — 50% ◆
TotalEnergies — 50% ◆Location
Taiwan Strait
Technology
Capacity
600 MW ◇
Turbines
—
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Origination
Taiwan Round 3 Zonal Development — Block 3.1 (區塊開發 3-1) · 2022 ·
Water depth
14–51 m ≈
Wind speed
11.1 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
—
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
1/9 fields verified · rests on 7 sources · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[4]
TotalEnergies2023-02-16
“Corio will remain the majority shareholder and lead developer with 50% plus 10 shares overall in project. (Shareholding table: Haiding 2 — Corio Generation 50.0000481%, TotalEnergies 49.9999519%)”
supportsowner
Trade press6
[1]
[2]
The Wind Power2025
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[3]
[6]
[7]
Central News Agency (中央社)2026-07-02◆ 離岸風電3-3期調整 經部:解約場址將納擴充容量範圍
Press report — cited, not quoted; read it at the source link.
supportsBackground
[8]
Central News Agency (CNA) Taiwan2026-04-20◆ CNA: EDF terminates Wei Lan Hai Changhua…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity