Formosa 6

Haiguang (海廣), off Xianxi Township, Changhua County — Synera Renewable Energy's first project in central Taiwan and, at 800 MW, the largest single site awarded in Taiwan's zonal-development programme to date.

Status
Advanced Developmentlifecycle stage
LikelyHafrok delivery likelihood
Ownership
Location
Taiwan
Taiwan Strait
Technology
Capacity 800 MW ◆ Turbines 57 ◆ Foundation Jacket ◆
Site & conditions
Site rights Seabed rights held Tender award · 經濟部 (Ministry of Economic Affairs) · 2024-08 ◆
Origination Taiwan Round 3 Zonal Development — Block 3.2 (區塊開發 3-2) · 2024 ·
Water depth 31–46 m ◆ Distance from shore 35 km ◆ Wind speed 10.4 m/s @ 150 m ≈
Revenue & grid
Offtake PPA ◆
Grid —
Schedule
FID Not taken
COD · Hafrok for registered readers

Delivery outlook modelled by Hafrok · calibrated on delivered projects

LikelyHafrok's delivery likelihood for Formosa 6
The developer has stated no date. Hafrok's year, the chance and the working are for registered readers.
Free for registered readers in early access · register below ↓

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

1 dated milestone on the spine, each with its source · 1 recorded ownership deal from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 12 sources (2 primary) · ◆ 8 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[7]
MOEA Energy Administration (經濟部能源署)2024-08-05◆ 附件、離岸風力發電區塊開發第二期容量分配結果
“「附件、離岸風力發電區塊開發第二期容量分配結果 — 獲選申請案/序位/獲配容量(MW)/完工併聯年度: 又德風力發電股份有限公司籌備處 1 700 118;海廣發電股份有限公司籌備處 2 800 118; 渢妙二號離岸風力發電股份有限公司籌備處 4 600 118;海鼎一風力發電股份有限公司籌備處 5 360 117; 德帥風力發電股分有限公司籌備處 6 240 117」 (Official Ro…”
supportsSite rightsTotal capacity
Operator2
[8]
Synera Renewable Energy (風睿能源)2026◆ Formosa 6 / 海廣風電
"Status In development | Installed capacity 800 MW | Foundation Jacket | Number of turbines 57 | Location 35 km off the coast of Changhua County, Taiwan | Water depth 31-46 m | Area 84 km2". Also: "Wi…
supportsTurbinesTotal capacityFoundationWater depthDistance from shore
[14]
Synera Renewable Energy (風睿能源)2026-09-09◆ SRE's Formosa 6 signs CPPA with Star Tra…
“Synera Renewable Energy Group (SRE), a pioneering offshore wind developer in the Asia-Pacific region, announced that its Formosa 6 Offshore Wind Project (Formosa 6) has entered into a corporate power …”
supportsoperatorMechanismDetail
Trade press9
[2]
offshoreWIND.biz2025-08
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacityFoundation
[3]
LSPR2024
supportsTotal capacity
[4]
Global Energy Monitor2026-07-02
supportsCoordinates
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[9]
Liberty Times (自由時報)2024-05-16◆ 海廣風場通過環評
Press report — cited, not quoted; read it at the source link.
supportsConsentConsent applied
[10]
Central News Agency (中央社)2025-02-14◆ 經部:離岸風電3-2期海廣風場完成簽約 4家已補件
Press report — cited, not quoted; read it at the source link.
supportsSite rights
[11]
Commercial Times (工商時報)2026-04-13◆ 策略轉向 台電擬投資海廣風場
Press report — cited, not quoted; read it at the source link.
supportsStatus note
[12]
offshoreWIND.biz2026-09-09◆ Formosa 6 Offshore Wind Farm and Star Tr…
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[13]
Taipei Times2026-09-10◆ Star Trade, Synera ink corporate power p…
Copyrighted source — cited, not quoted; read it at the source link.
supportsFirst powerMechanismDetail
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.