Formosa 6
Haiguang (海廣), off Xianxi Township, Changhua County — Synera Renewable Energy's first project in central Taiwan and, at 800 MW, the largest single site awarded in Taiwan's zonal-development programme to date.
Status
Advanced Developmentlifecycle stage
LikelyHafrok delivery likelihood
Ownership
Location
Taiwan Strait
Technology
Capacity
800 MW ◆
Turbines
57 ◆
Foundation
Jacket ◆
Site & conditions
Site rights
Seabed rights held Tender award · 經濟部 (Ministry of Economic Affairs) · 2024-08 ◆
Origination
Taiwan Round 3 Zonal Development — Block 3.2 (區塊開發 3-2) · 2024 ·
Water depth
31–46 m ◆
Distance from shore
35 km ◆
Wind speed
10.4 m/s @ 150 m ≈
Revenue & grid
Offtake
PPA ◆
Grid
—
Schedule
FID
Not taken
COD · Hafrok
for registered readers
Delivery outlook modelled by Hafrok · calibrated on delivered projects
LikelyHafrok's delivery likelihood for Formosa 6
The developer has stated no date. Hafrok's year, the chance and the working are for registered readers.
Free for registered readers in early access · register below ↓
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
1 dated milestone on the spine, each with its source · 1 recorded ownership deal from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 12 sources (2 primary) · ◆ 8 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[7]
MOEA Energy Administration (經濟部能源署)2024-08-05◆ 附件、離岸風力發電區塊開發第二期容量分配結果
“「附件、離岸風力發電區塊開發第二期容量分配結果 — 獲選申請案/序位/獲配容量(MW)/完工併聯年度: 又德風力發電股份有限公司籌備處 1 700 118;海廣發電股份有限公司籌備處 2 800 118; 渢妙二號離岸風力發電股份有限公司籌備處 4 600 118;海鼎一風力發電股份有限公司籌備處 5 360 117; 德帥風力發電股分有限公司籌備處 6 240 117」 (Official Ro…”
supportsSite rightsTotal capacity
Operator2
[8]
Synera Renewable Energy (風睿能源)2026◆ Formosa 6 / 海廣風電
"Status In development | Installed capacity 800 MW | Foundation Jacket | Number of turbines 57 | Location 35 km off the coast of Changhua County, Taiwan | Water depth 31-46 m | Area 84 km2". Also: "Wi…
supportsTurbinesTotal capacityFoundationWater depthDistance from shore
[14]
Synera Renewable Energy (風睿能源)2026-09-09◆ SRE's Formosa 6 signs CPPA with Star Tra…
“Synera Renewable Energy Group (SRE), a pioneering offshore wind developer in the Asia-Pacific region, announced that its Formosa 6 Offshore Wind Project (Formosa 6) has entered into a corporate power …”
supportsoperatorMechanismDetail
Trade press9
[2]
offshoreWIND.biz2025-08
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacityFoundation
[3]
[4]
[6]
[9]
Liberty Times (自由時報)2024-05-16◆ 海廣風場通過環評
Press report — cited, not quoted; read it at the source link.
supportsConsentConsent applied
[10]
Central News Agency (中央社)2025-02-14◆ 經部:離岸風電3-2期海廣風場完成簽約 4家已補件
Press report — cited, not quoted; read it at the source link.
supportsSite rights
[11]
Commercial Times (工商時報)2026-04-13◆ 策略轉向 台電擬投資海廣風場
Press report — cited, not quoted; read it at the source link.
supportsStatus note
[12]
offshoreWIND.biz2026-09-09◆ Formosa 6 Offshore Wind Farm and Star Tr…
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[13]
Taipei Times2026-09-10◆ Star Trade, Synera ink corporate power p…
Copyrighted source — cited, not quoted; read it at the source link.
supportsFirst powerMechanismDetail