Formosa 1 Phase 2
Located 2-6 km off Zhunan Township, Miaoli County. Phase 1 demo (2x4 MW, 2017) excluded — below 10 MW threshold.
Status
Operationallifecycle stage
Ownership
Location
Taiwan Strait
Technology
Capacity
120 MW ◇
Turbines
20 × 6 MW ◆
Model
Siemens Swt 6-0-154 ◆
Foundation
Monopile ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
Taiwan Offshore Wind Demonstration Incentive Program (示範獎勵) · 2013 ·
Water depth
9–35 m ≈
Distance from shore
6 km ◇
Wind speed
10.2 m/s @ 100 m ≈
Revenue & grid
Offtake
PPA ◆
Grid
Not recorded ◇
Connection
Miaoli Zhunan onshore substation (Taipower grid) ◇
Schedule
FID
2018 ◇
COD
2020-Q1 ◇
Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record
6 dated milestones on the spine, each with its source · 6 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓
Revenue & offtake contract terms, price levels and the route to market
the PPA contract's terms · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓
Installation how the build is going · from sourced statements and Hafrok's registers
construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓
Sources & verification
Rests on 12 sources (3 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[12]
Bureau of Energy, Ministry of Economic Affairs (Executive Yuan meeting 3607)2018-07-05◆ 離岸風電推動進度報告(行政院第3607次會議)
“海洋示範案 @苗栗縣 ... 示範風場 120 MW:預計 108/12/31 商轉 ... 106/12/12 與台電公司完成「風力發電離岸系統電能購售 契約」(PPA) 簽訂”
supportsMechanismDetail
Operator1
[13]
Formosa I Wind Power Co., Ltd. (海洋風電)2026-10-12◆ 工程規劃 (project milestones) – Formosa 1 – …
“第二階段 取得籌備創設許可 2018/02/05 ... 風機基礎結構開始施工 2019/06/01”
supportsConsentOnshore constructionOffshore constructionConsent granted
OEM1
[10]
Siemens Gamesa Renewable Energy2018-04
“20 SWT-6.0-154 Direct Drive wind turbines to be supplied at Formosa 1 Phase 2 ... located around six kilometers off the west coast of the Miaoli district in the Taiwan Strait with water depths between…”
supportsTurbinesModelUnit capacity
Trade press7
[3]
[4]
[5]
[7]
Environmental Information Center (環境資訊中心)2017-07-03
“環署3日下午通過「海洋竹南離岸式風力發電計畫」的環差案。”
supportsConsentConsent granted
[8]
offshoreWIND.biz2019-09-09
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[9]
[11]
offshoreWIND.biz2019-10-09
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacity
Unverified import1
[1]
Encyclopaedic1
[2]
Wikipedia2025
“The Macquarie Group then secured funding in June 2018 for the project from local and international banks. ... The second phase of the project started in end of May 2019 ... Taiwan's Formosa 1 offshore…”
supportsoperatorownerFinal investment decisionOnshore constructionOffshore construction+3 more


