Two adjacent sites: Changfang (off Fangyuan) and Xidao (off Wangong), Changhua County. Copenhagen Offshore Partners (COP) led development for CIP.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2021’22’23’24’25’26View the source for Construction startConstruction start 2020 View the source for First powerFirst power Nov 2022 View the source for Commercial operationCommercial operation 2024 No origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDCIP → Taiwan Life Insurance / TransGlobe Life Insurance — stake not disclosed · closed 2020-02 2020-01 FARMDOWNCIP → GPSC (Global Power Synergy Public Company) — 25.0% · closed 2022-09 2021-07 FARMDOWNTODAYCIP — 62.5% today · operator CIP CIP 62.5%Taiwan Life — 6.25% today Taiwan Life Taiwan Life 6.25%Transglobe Life — 6.25% today Transglobe Life Transglobe Life 6.25%GPSC — 25% today GPSC GPSC 25%CIP → Taiwan Life Insurance / TransGlobe Life Insurance — stake not disclosed · closed 2020-02 CIP → Taiwan Life Insurance / TransGlobe Life Insurance — stake not disclosed · closed 2020-02 CIP → GPSC (Global Power Synergy Public Company) — 25.0% · closed 2022-09 25%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

600 MW contracted — feed-in tariff
Feed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Priceprice undisclosed ·Capacity600 MWAwardedApr 2018
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2024

Sources & verification

4/15 fields verified · rests on 9 sources · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction results1
[9]
Conventus Law2026-06-22◆ tw-selection-2018-tw-2018-bond
Taiwan 2018 grid allocation: Stage-1 NT$4m/MW + Stage-2 NT$2m/MW performance bond; establishment permit before end-2019
supportsFeed-in tariff · Taiwan 2018 Offshore Wind Capacity Allocation — Selection (遴選)
Trade press7
[2]
offshoreWIND.biz2024-05-22
Press report — cited, not quoted; read it at the source link.
supportsoperatorowner
[3]
Copenhagen Offshore Partners2024
“entering the construction phase in early 2020 just before the COVID-19 pandemic hit the world”
supportsConstruction startSite rightsTurbinesModelTotal capacity+2 more
[4]
GEM2026
“Changfang And Xidao Offshore wind farm (彰芳離岸風場, CIP彰芳暨西島離岸風場 600MW, 彰化西島離岸風力發電計畫, 彰芳一期, 彰芳二期) is an operating wind farm in Fangyuan Town, Changhua County, Taiwan.”
supportsConsentFinal investment decisionCommercial operationStatusConnection point+1 more
[5]
GEBCO Compilation Group2020
supportsWater depth
[6]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[7]
offshoreWIND.biz2022-11-15
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1