Mareld
Technology
Capacity
2,500 MW ◇
Turbines
—
Foundation
Floating ◇
Site & conditions
Site rights
Application filed 2026-07 ◆
Water depth
184–305 m ≈
Distance from shore
40 km ◆
Wind speed
9.9 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
COD
—
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
3/11 fields verified · rests on 7 sources (2 primary) · ◆ 3 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[5]
Hexicon AB (publ)2026-05-08◆ Hexicon AB (publ) acquires the remaining…
“Hexicon AB (publ) (“Hexicon”) today announces that it has entered into an agreement to acquire the remaining 50 percent of the shares in Mareld Green Energy AB from its joint venture partner Mainstrea…”
supportsowner
[6]
Regeringskansliet (Klimat- och näringslivsdepartementet)2026-07-16◆ Nya beslut om havsbaserad vindkraft
"Samtidigt har regeringen beslutat att neka tillstånd till övriga ansökningar. Regeringen bedömer att de ansökta verksamheterna bland annat skulle medföra en oacceptabel påverkan på vår försvarsförmåg…
supportsConsentSite rights
[7]
Hexicon AB (publ)2026-07-16◆ Hexicon AB’s (publ) offshore wind projec…
“Mareld was planned approximately 40 kilometres west of Orust, within Sweden's exclusive economic zone.”
supportsDistance from shore
Trade press4
[1]
offshoreWIND.biz2024
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[2]
[3]
[4]