Gretas Klackar 1

Status
Cancelledlifecycle stage
Ownership
SVSvea Vind Offshore — 100% 
Location
Sweden
Gulf of Bothnia
Technology
Capacity 1,400 MW 
Turbines
Foundation
Site & conditions
Site rights Application filed 2026-07  Water depth 39–60 m  Distance from shore 18 km  Wind speed 9.1 m/s @ 150 m 
Revenue & grid
Offtake
Grid
Schedule
COD

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageCancelled
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

1/10 fields verified · rests on 5 sources (1 primary) · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[1]
Svea Vind Offshore2024
supportsownerTotal capacity
[5]
Regeringskansliet (Klimat- och näringslivsdepartementet)2026-07-16◆ Nya beslut om havsbaserad vindkraft
"Samtidigt har regeringen beslutat att neka tillstånd till övriga ansökningar. Regeringen bedömer att de ansökta verksamheterna bland annat skulle medföra en oacceptabel påverkan på vår försvarsförmåg…
supportsConsentSite rights
Trade press3
[2]
The Wind Power2026
Press report — cited, not quoted; read it at the source link.
supportsDistance from shoreCoordinates
[3]
GEBCO Compilation Group2020
supportsWater depth
[4]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed