Galene

Located 21 km west of Varberg, off Halland coast, in Swedish EEZ. 42 km2 area. Up to 21 turbines. Expected annual production ~1.7 TWh.

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2035
expected year of commercial operation
Chance of delivery
≈68% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. This one sits well below that: a market with a thinner delivery record, technical complexity and no offtake contract yet.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2034: 14.1% (conditional on completion) 2035: 28.0% (conditional on completion) 2036: 22.7% (conditional on completion) 2037: 14.6% (conditional on completion) 2038: 8.7% (conditional on completion) 2039: 5.1% (conditional on completion) 2040: 3.1% (conditional on completion) 2041: 1.8% (conditional on completion) 2042: 1.1% (conditional on completion) 2043: 0.7% (conditional on completion)2026now2028203020322034203528%EXPECTED2036203820402042
COD probability by year, conditional on completion
YearProbability
203414.1%
2035 (expected)28.0%
203622.7%
203714.6%
20388.7%
20395.1%
20403.1%
20411.8%
20421.1%
20430.7%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2023. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2028; the faster quarter of similar projects would be done by 2026, the slower quarter not until 2028.
3
No route to market yet — counted from 2029
The project has no offtake contract yet. No contract, auction or tariff exists in Sweden today that a project without an offtake agreement could win, and none is scheduled. Hafrok believes a first support award there is unlikely before 2029 Q3, and counts from then. This is Hafrok's judgment, not a fact on the record — what it rests on: Sweden market page. The permits are not affected; winners typically reach final investment decision about 2 years after an award (2031 Q3), then build time on top gives 2034 Q3. That is later than the milestone timing, so the auction sets the date.
4
Result
Expected commercial operation 2035, likely range 2033–2035 (the middle half of outcomes for similar projects). The auction step above sets the date: the round has to be won before building can start.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈68%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2023’24’25’26’27’28’29’30’31’32’33’34’35View the source for Consent grantedConsent granted May 2023 Commercial operation 2035 ·Hafrok expectedNo origination on record — who held the site before the first recorded deal is not known; shown as a gap, never guessed. UNRECORDEDOX2 → Ingka Investments — 49.0% · closed 2022-Q4 2022-08 FARMDOWNTODAYOX2 — 51% today · operator OX2 OX2 51%Ingka Investments — 49% today · investor Ingka Investments Ingka Investments 49%OX2 → Ingka Investments — 49.0% · closed 2022-Q4 49%
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake route to market — open

No offtake secured — route to market open

Letter of intent (intentionsavtal) with Varberg Energi (June 2024) — long-term goal is a PPA; no binding contract signed as of June 2025

The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operationnot stated

Sources & verification

6/14 fields verified · rests on 10 sources (1 primary) · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[4]
OX22023-05-16◆ OX2 receives permission to build 400 MW …
“The Swedish government announced today that OX2 has received permission to build the northern part of the project Galatea-Galene on the west coast of Sweden, with a potential capacity of around 400 MW…”
supportsConsentSite rightsTotal capacityConsent granted
[11]
Ingka Group2022-12
“acquires a 49 percent share in three offshore wind development projects in Sweden ... The three wind power projects are Galatea-Galene in Kattegat, Triton in the Baltic Sea south of Sweden and Aurora …”
supportsoperatorinvestor
Trade press7
[6]
offshoreWIND.biz2024-01-10
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[7]
offshoreWIND.biz2024-06-24
Press report — cited, not quoted; read it at the source link.
supportsDetailOfftake history
[10]
Energi.se2025-06
“Målsättningen är att kunna börja bygga vindkraftsparken 2027 och leverera den första elen 2031.”
supportsFirst power
[12]
offshoreWIND.biz2024-01
Press report — cited, not quoted; read it at the source link.
supportsTurbinesTotal capacityDistance from shore
[13]
The Wind Power2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[14]
GEBCO Compilation Group2020
supportsWater depth
[15]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown◆ OX2 receives permission to build 400 MW …
supportsTurbinesTotal capacityWater depthDistance from shoreCoordinates