Utsira Nord (Area 2 - Harald Harfagre)
Located off Utsira island, near Haugesund, in the Norwegian Channel. Deep water (185-280m) requires floating foundations.
Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
HHHarald Hårfagre AS — 100% ◆
Location
North Sea
Technology
Capacity
500 MW ◇
Turbines
30 ◇
Foundation
Floating ◇
Site & conditions
Site rights
Seabed rights held ∴
Origination
Utsira Nord (floating) — area allocation · 2025 ·
Water depth
250–270 m ◇
Distance from shore
15 km ◇
Wind speed
10.2 m/s @ 150 m ≈
Revenue & grid
Offtake
Other ◇
Grid
—
Schedule
FID
Not taken
COD · announced
2030 ◇
COD · Hafrok
2035 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2035
expected year of commercial operation
The developer says 2030; Hafrok expects 2035 — 5 years later.
Chance of delivery
≈54%
estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a market with a thinner delivery record, its size and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal) · the developer’s COD guidance, by date stated (ink)
| Year | Probability |
|---|---|
| 2034 | 14.1% |
| 2035 (expected) | 28.0% |
| 2036 | 22.7% |
| 2037 | 14.6% |
| 2038 | 8.7% |
| 2039 | 5.1% |
| 2040 | 3.1% |
| 2041 | 1.8% |
| 2042 | 1.1% |
| 2043 | 0.7% |
| Stated | Announced COD |
|---|---|
| 2026-04-15 | 2034 |
| 2026-06-16 | 2030 |
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (
2026), adds the time similar projects (floating, in developing offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before
2035 is not credible.3
Result
Expected commercial operation
2035, likely range 2035–2041 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈54%, which rates it
Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2025-12
Utsira Nord (floating) — area allocation
- Awarded to
- Harald Hårfagre AS (Deep Wind Offshore + EDF Renouvelables)
- Basis
- integrated tender
From the auction results — the round that created the project.
JV formation · 2021-Q4
Deep Wind Offshore · EDF Renewables stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2021-Q4
- Closed
- 2025-12
- Project stage
- early development
Deep Wind Offshore and EDF Renewables formed the Harald Harfagre consortium to develop floating offshore wind at Utsira Nord, with collaboration beginning in 2021. EDF Renewables formally extended and deepened the collaboration in January 2024 ahead of the tender submission. The consortium (Harald Harfagre AS) submitted its application to the Norwegian Ministry of Energy in September 2025. The Norwegian Ministry of Energy announced on 11 December 2025 that Harald Harfagre would be awarded project area 3 of Utsira Nord (500 MW). The consortium was one of only two applicants in Norway's first floating wind tender. No financial consideration for collaboration agreement or area award. Project now enters EIA phase; licence application required within 2 years of EIA programme approval. State aid auction planned 2028-2029 (NOK 35bn max for one project across both Utsira Nord areas; only one winner). Announced date estimated as late 2021 (precise formation date not publicly disclosed); closed date reflects area award.
Evidence
- offshorewind.biz — Norway's Two Floating Wind Tender Applicants to Be Awarded Project Sites ↗ ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced COD: pulled forward -4.0 yr (first announced 2034) · the full guidance history is in the delivery chart above
Revenue & offtake route to market — open
No offtake secured — route to market open
State aid competition (NOK 35bn max, 2025 value); one of the two Utsira Nord consortia will win support based on requiring the least state aid. Eligibility triggered by submission of konsesjon application. Auction expected following consenting phase (likely 2028-2029); no offtake contracted yet. ◇
The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2030
Construction ports
PortHaugesund ∅
Sources & verification
1/13 fields verified · rests on 8 sources (1 primary) · ◆ 5 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[1]
Deep Wind Offshore2026-06◆ Utsira Nord - Deep Wind Offshore
“Harald Harfagre consortium awarded its preferred area at Utsira Nord, project area two [...] 500 MW floating offshore wind farm at Utsira Nord in the Norwegian North Sea comprising about 30 floating w…”
supportsCommercial operationCOD historyTurbinesTotal capacityFoundation+1 more
[6]
Brønnøysund Register Centre (Enhetsregisteret)2026-08-22◆ Enhetsregisteret extract - Harald Harfag…
“HARALD HÅRFAGRE AS, organisasjonsnummer 927823667, aksjeselskap registered 2021-09-28, forretningsadresse c/o Deep Wind Offshore AS, Øvregata 124, Haugesund; næringskode 35.122 Produksjon av elektrisi…”
supportsoperator
[7]
Deep Wind Offshore2025-12-11◆ Deep Wind Offshore and EDF power solutio…
“Deep Wind Offshore and EDF power solutions awarded site at Utsira Nord (December 11, 2025). "The award highlights the strength of the partnership between EDF power solutions and Deep Wind Offshore." W…”
supports↳ parents
Auction pipeline1
[8]
Norwegian Ministry of Energy (regjeringen.no)2026◆ regjeringen-utsira-nord
Utsira Nord — two-stage model; state-aid auction (lowest support wins, ~500 MW, NOK 35bn cap) follows the area allocation after a maturation phase.
supportsUtsira Nord state-support competition
Trade press4
[2]
offshoreWIND.biz2025-12-12◆ Norway's Two Floating Wind Tender Applic…
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetailOfftake history
[3]
Windtech International2025-12-12
Press report — cited, not quoted; read it at the source link.
supportsConsent
[4]
Offshore Magazine2023-09
Press report — cited, not quoted; read it at the source link.
supportsTurbinesWater depthDistance from shore
[5]