TetraSpar Demonstrator

Floating-foundation demonstrator at METCentre, Karmoy.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).

Revenue & offtake the regime the project was built under

Offtake regime not on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2021

Sources & verification

2/12 fields verified · rests on 7 sources (1 primary) · ◆ 2 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[7]
Stiesdal Offshore2026-03-27◆ TetraSpar Demonstrator to be decommissio…
“TetraSpar Demonstrator ApS, a project company owned by Stiesdal Offshore, RWE and TEPCO Renewable Power, today announced the planned decommissioning of the floating TetraSpar Demonstrator ... The oper…”
supportsStatus note
Trade press6
[1]
offshoreWIND.biz2021
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionCommercial operationSite rightsTotal capacity
[2]
offshoreWIND.biz2021
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacityFoundationDistance from shore
[3]
METCentre2026
supportsCoordinates
[4]
offshoreWIND.biz2026-03-27
Press report — cited, not quoted; read it at the source link.
supportsowner
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[8]
offshoreWIND.biz2026-09-08◆ TetraSpar Floater Completes Five-Year Te…
Press report — cited, not quoted; read it at the source link.
supportsStatus note