Doordewind I

Located ~77 km off north coast of Netherlands. Total zone area ~580 km2 for both Doordewind I and II (4 GW total).

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
Location
Netherlands
North Sea
Technology
Capacity 2,000 MW 
Turbines
Foundation
Site & conditions
Site rights State-designated Doordewind I / II + further roadmap (HKW VIII, North of Wadden I) 
Water depth 37–39 m  Distance from shore 77 km  Wind speed 10.3 m/s @ 150 m 
Revenue & grid
Offtake Other  Grid No agreement  Connection TenneT 2 GW HVDC offshore platform planned; approximately 112 … 
Schedule
FID Not taken
COD · announced 2032 
COD · Hafrok 2033 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2033
expected year of commercial operation
The developer says 2032; Hafrok expects 2033 — 1 year later.
Chance of delivery
≈55% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. This one sits well below that: a very large build and technical complexity. A secured offtake contract helps only slightly.
COD outlook
If it completes, when — Hafrok’s probability by year (teal) · the developer’s COD guidance, by date stated (ink)
20%40%60%80%100% 2032: 14.1% (conditional on completion) 2033: 28.0% (conditional on completion) 2034: 22.7% (conditional on completion) 2035: 14.6% (conditional on completion) 2036: 8.7% (conditional on completion) 2037: 5.1% (conditional on completion) 2038: 3.1% (conditional on completion) 2039: 1.8% (conditional on completion) 2040: 1.1% (conditional on completion) 2041: 0.7% (conditional on completion)2026now202820302032203328%EXPECTED2034203620382040 Developer-announced COD: 2032 ANNOUNCED 2032developer cod guidance2026-04-15: the developer guided 2032-Q42026-042032-Q4 2026-06-16: the developer guided 2032 — source [3] — click for it2026-062032 [3]
COD probability by year, conditional on completion
YearProbability
203214.1%
2033 (expected)28.0%
203422.7%
203514.6%
20368.7%
20375.1%
20383.1%
20391.8%
20401.1%
20410.7%
Developer COD guidance, by the date it was stated
StatedAnnounced COD
2026-04-152032-Q4
2026-06-162032
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (in established offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2033 is not credible.
3
Still needs an offtake award: NL-IJMUIDEN-VER-GAMMA-A
The project has no offtake contract yet. The next visible auction is around 2026 Q4; winners typically reach final investment decision about 2 years after an award (2028 Q4), then build time on top gives 2031 Q4. The milestone timing is already later than that, so it stands.
4
Result
Expected commercial operation 2033, likely range 2033–2039 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
5
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
6
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈55%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline verified milestones only — each date carries its provenance mark

2027’28’29’30’31’32’33Developer-announced COD: 2032 announced COD 2032Commercial operation 2033 ·Hafrok expected
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD.
Announced COD: held (announced 2032-Q4, unchanged) · the full guidance history is in the delivery chart above

Revenue & offtake route to market — open

No offtake secured — route to market open

Tender not yet opened. Netherlands transitioning to two-way CfD contracts from 2027; first offshore CfD tender planned end-2027.

The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
Doordewind I / II + further roadmap (HKW VIII, North of Wadden I)
expected — · planned · the round names this project
indicative

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2032
Construction ports
PortEemshaven ·quay 5000 m · crane 50 t · draft 14 m
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
HVDC systemDoordewind 1·2000 MW · ±525 kV · planned, expected 2032
Export & onshore
Export cableDoordewind 1 Export Cable·HVDC subsea · 126 km · NKT · planned · to Eemshaven Oude Schip
Onshore connectionEemshaven Converter Station (Doordewind 1)·525 DC / 380 AC kV · planning
Converter supplierHitachi Energy·Doordewind 1 · TBD (Hitachi Energy / L&T consortium) · for TenneT
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) and the year Hafrok expects (teal band) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
20262027202820292030203120322033Hafrok expects the farm to start in 2033developer’s stated start 2032nowDoordewind 1Doordewind 1expected 2032expected 2032Eemshaven Converter Station (Doordewind 1)Eemshaven Converter Station (Door…expected 2033expected 2033Doordewind 1 Export CableDoordewind 1 Export Cableexpected 2031expected 2031

Sources & verification

0/14 fields verified · rests on 9 sources (2 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[4]
RVO (Netherlands Enterprise Agency)2026◆ RVO new offshore wind farms roadmap
“Doordewind WFS I — About 2 GW — approximately 77 kilometers from the coast. Permit procedure: to be determined. Expected commissioning: to be determined.”
supportsConsentTotal capacityMechanismDetailOfftake history
[8]
RVO — Bureau Energieprojecten (energietransitie.nl)2026-08-23◆ Dutch Bureau Energieprojecten register (…
“Listing row "Wind op zee - Doordewind" (key wind-op-zee-doordewind); offshore docket page text hash 13a01fcbd9072a42… (5383 chars). Listing row "Net op zee - Doordewind" (key net-op-zee-doordewind); o…”
supportsRegister entry
Auction pipeline1
[9]
RVO2026◆ rvo-roadmap-2026
RVO roadmap — Doordewind I/II, HKW VIII, North of the Wadden Islands I planned; Lagelander removed ("no wind farms will be developed").
supportsDoordewind I / II + further roadmap (HKW VIII, North of Wadden I)
Trade press6
[1]
offshoreWIND.biz2025-03-28◆ G-TEC Completes Seabed Survey in Dutch D…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityDistance from shore
[2]
offshoreWIND.biz2024-04-11
Press report — cited, not quoted; read it at the source link.
supportsStatusConnection point
[3]
offshoreWIND.biz2025-12-23◆ TenneT Selects NjordIC for Doordewind UX…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationCOD historyStatusConnection pointport
[5]
4C Offshore2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[6]
GEBCO Compilation Group2020
supportsWater depth
[7]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed