Borssele V (Innovation Site)

Innovation and demonstration site in Borssele Wind Farm Zone. Won at zero-subsidy by Two Towers consortium (Van Oord / Investri / Green Giraffe).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2016’17’18’19’20’21’22’23’24’25’26View the source for Consent grantedConsent granted 24 Mar 2016 Borssele Wind Farm Site V (innovation site) — awarded to Two Towers B.V. (Van Oord Renewable Finance, Investri Offshore, Green Giraffe Holding)Borssele Wind Farm Site V (innovation site) Apr 2018 · auction recordView the source for Offshore constructionOffshore construction 2020 View the source for First powerFirst power Feb 2021 View the source for Commercial operationCommercial operation Feb 2021 Borssele Wind Farm Site V (innovation site) — awarded to Two Towers B.V. (Van Oord Renewable Finance, Investri Offshore, Green Giraffe Holding) 2018-04 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYTwo Towers B.V. (Van Oord Renewable Finance, Investri Offshore, Green Giraffe Holding) Two Towers B.V. Two Towers B.V. not among today’s recorded owners — no sale recordedOctopus Energy Generation — 100% today · operator Octopus Energy Generati… Octopus Energy Generati… 100%Borssele Wind Farm Site V (innovation site) — awarded to Two Towers B.V. (Van Oord Renewable Finance, Investri Offshore, Green Giraffe Holding) Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations2 of 2100% · first seen 2020-04-23
Turbines2 of 2100% · first seen 2020-12-03
Latest count2022-12-30from 508 satellite passes · 0 substation platforms left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (2 turbines + 0 platforms); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
122 planned (turbines and platforms)latest count 2022-12-30foundations — running total, confirmedApr 2020 — 2 this month · 2 in totalDec 2020 — 0 this month · 2 in totalJan 2021 — 0 this month · 2 in totalturbines up — running total, confirmedApr 2020 — 0 this month · 0 in totalDec 2020 — 1 this month · 1 in totalJan 2021 — 1 this month · 2 in total2 foundations2 turbines upApr 2020Dec 2020Jan 2021
Satellite image
Image taken2026-09-07Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed2 confirmed · 0 not yet confirmedas counted on 2022-12-30 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortVlissingen ·quay 1740 m · crane 1200 t
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-07
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (2)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Borssele V (Innovation Site), 2026-09-07

Sources & verification

17/18 fields verified · rests on 8 sources (4 primary) · ◆ 7 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator2
[2]
RVO (Netherlands Enterprise Agency)2017-10◆ Borssele Wind Farm Zone Site V Innovatio…
“BWFS V is 0.59 km2 in size [...] The bathymetric data shows water depth ranging between from -15 m to -37 m aLAT for BWFS III and V [...] BWFS V will connect with one 66 kV inter array cable directly …”
supportsTurbinesTotal capacityStatusConnection pointWater depth+3 more
[3]
RVO (Netherlands Enterprise Agency)2018-04-06◆ RVO Borssele V results
“On Friday 6 April 2018, Minister Wiebes of Economic Affairs and Climate announced that Two Towers B.V., a consortium of Van Oord Renewable Finance, Investri Offshore and Green Giraffe Holding, won the…”
supportsMechanismDetail
Operator2
[1]
Ministerie van Economische Zaken (Netherlands)2016-03-24◆ Kavelbesluit V (innovatiekavel) windener…
“twee windturbineposities, met een maximum vermogen van in totaal 20 MW. Dit innovatiekavel (kavel V) is gesitueerd aan de noordzijde van kavel III. De twee windturbines sluiten via een aparte kabel aa…”
supportsConsentTurbinesConsent granted
[6]
Octopus Energy Generation2022-06-29◆ Octopus Energy accelerates European expa…
“Octopus Energy Generation's fund management team acquired the Borssele V offshore wind farm, operated by Eneco. The 19 MW capacity Borssele V wind farm has been operational since 2021. Octopus bought …”
supportsoperatorTotal capacity
Trade press4
[4]
offshoreWIND.biz2020-04-28◆ Slip Joint Foundation Makes Debut Off th…
Press report — cited, not quoted; read it at the source link.
supportsOffshore constructionModelUnit capacityFoundationDistance from shore
[5]
offshoreWIND.biz2021-02-25◆ Dutch Offshore Wind Innovation Site Full…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decisionFirst powerCommercial operationTurbinesModel+2 more
[7]
offshoreWIND.biz2022-06-29◆ Dutch Offshore Wind Innovation Site Gets…
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetail
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed