Nakwol

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2029
expected year of commercial operation
Chance of delivery
≈96% estimated chance this project reaches commercial operation
Under Construction projects complete ≈97% of the time on Hafrok's record. A market with a thinner delivery record, technical complexity and no offtake contract yet pull this one slightly below that.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2028: 10.0% (conditional on completion) 2029: 58.5% (conditional on completion) 2030: 26.6% (conditional on completion) 2031: 4.5% (conditional on completion) 2032: 0.5% (conditional on completion)2026now20272028202958%EXPECTED203020312032
COD probability by year, conditional on completion
YearProbability
202810.0%
2029 (expected)58.5%
203026.6%
20314.5%
20320.5%
How Hafrok got this date
1
Starting point: the last dated milestone
Construction start in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2029; the faster quarter of similar projects would be done by 2028, the slower quarter not until 2029 Q3.
3
Result
Expected commercial operation 2029, likely range 2028–2030 (the middle half of outcomes for similar projects). The typical build time from the construction start is used.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Under Construction projects that went on to complete — ≈97%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Based on the measured record — all 257 construction starts with a final outcome reached operation — adjusted down for projects still mid-build and for legal-challenge risk. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈96%, which rates it Delivering on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline verified milestones only — each date carries its provenance mark

2026’27’28’29View the source for First powerFirst power 2 Dec 2025 Commercial operation 2029 ·Hafrok expected
Dashed tick marks today (9 Sep 2026).

Revenue & offtake contract duration and price levels · money of the day

365 MW contracted — utility PPA
Utility PPA · South Korea 2023 Wind Fixed-Price Auction — offshore carve-out
Priceprice undisclosed ·Capacity364.8 MWAwardedDec 2023
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation under way
no satellite count yet: this farm is outside the tracker’s coverage so far
Installation · on record
StageUnder Construction
Offshore constructionstarted
Expected start of operationnot stated

Sources & verification

1/13 fields verified · rests on 8 sources · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction results1
[8]
Shin and Kim2026-06-22◆ kr-rps-wind-2023-kr-rps-terms
Korea RPS fixed-price offshore: completion-period bands 60/72/78 months; REC-price cut / cancellation on miss
supportsUtility PPA · South Korea 2023 Wind Fixed-Price Auction — offshore carve-out
Trade press7
[1]
Global Energy Monitor2025
supportsConsentFinal investment decisionSite rightsTotal capacity
[2]
Global Energy Monitor2026
supportsCoordinates
[3]
4C Offshore2025
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityFoundation
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
Kaohoon International2025-10-17
“B.Grimm Power Korea directly holds 49% of the issued shares in Nakwol 1. [after acquiring an additional 20.8% from Myungwoon Industry Development and selling its 29% holding in Myungwoon back to that …”
supportsdeveloperowner
[6]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[7]
전기신문 (Electimes)2025-12-10
Press report — cited, not quoted; read it at the source link.
supportsFirst power