Hanlim Offshore Wind Farm
Public consortium-led project. Second offshore wind farm on Jeju Island after Tamra.
Status
Operationallifecycle stage
Ownership
KEKEPCO — 29% ◆
KMKorea Midland Power — 23% ◆
HEHyundai E&C — 10% ◆
HSHanlim SPV minority investors — 38% ◆
Location
East China Sea
Technology
Capacity
100 MW ◇
Turbines
18 × 5.56 MW ◇
Model
Doosan Enerbility 5-56 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
16–43 m ≈
Wind speed
7.3 m/s @ 100 m ≈
Revenue & grid
Offtake
Other ◇
Grid
Not recorded ◇
Connection
Grid connection secured ◇
Schedule
FID
Feb 2022 ◆
COD
2025-Q4 ◇
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime: Korean RPS
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2025-Q4
Sources & verification
2/14 fields verified · rests on 10 sources (1 primary)
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[2]
KEPCO2025-12
“16.12월 한전-중부발전-한전기술-현대건설-바람㈜간 업무협약을 체결하고 '17년 제주한림해상풍력㈜ 설립 [한전 29% , 중부발전 23%, 그 외 48% 출자]”
supportsoperatorowner
[9]
Hyundai E&C Newsroom (현대건설 뉴스룸)2024-10-22
“2022년 1월 착공한 이래 34개월의 공사 끝에 최근 대부분의 공사를 마무리 지었습니다. ... 이미 지난해 연말 사용전 검사를 완료한 6기의 발전기는 상업운전을 시작, 수익을 창출하고 있는데요.”
supportsConstruction startSite rights
Trade press7
[3]
[4]
Offshore Wind Biz2025
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesModelUnit capacityTotal capacity+2 more
[5]
[6]
[7]
Headline Jeju2020-08-14
“제주특별자치도는 14일 총 100㎿ 규모의 제주한림해상풍력발전 개발사업시행 승인을 고시했다고 밝혔다.”
supportsConsentConsent granted
[8]
Energy News (에너지신문)2022-02-25
“제주 한림해상풍력 발전사업의 금융약정이 24일 체결됐다. ... 국내 최대규모 해상풍력발전사업을 위한 자금조달 성공을 기념하기 위해 25일 금융약정식이 열렸다.”
supportsFinal investment decision
[10]
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityWater depth+1 more