Dadaepo Offshore Wind Farm

Located near Dadaepo/Busan area. KOSPO is Korea Southern Power, a state-owned utility.

Status
Early Developmentlifecycle stage
ProspectiveHafrok completion outlook
Ownership
KSKorea Southern Power — 50% 
CGCorio Generation — 50% 
Location
South Korea
Sea of Japan (East Sea)
Technology
Capacity 99 MW  Turbines — 
Foundation
Site & conditions
Site rights Application filed 2020-07  Water depth 30–41 m  Wind speed 7.9 m/s @ 150 m 
Revenue & grid
Offtake Other 
Grid
Schedule
FID Not taken
COD · announced 2028 
COD · Hafrok 2034 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2034
expected year of commercial operation
The developer says 2028; Hafrok expects 2034 — 6 years later.
Chance of delivery
≈60% estimated chance this project reaches commercial operation
Early Development projects complete ≈61% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; a market with a thinner delivery record and technical complexity pull a little the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2033: 14.1% (conditional on completion) 2034: 28.0% (conditional on completion) 2035: 22.7% (conditional on completion) 2036: 14.6% (conditional on completion) 2037: 8.7% (conditional on completion) 2038: 5.1% (conditional on completion) 2039: 3.1% (conditional on completion) 2040: 1.8% (conditional on completion) 2041: 1.1% (conditional on completion) 2042: 0.7% (conditional on completion)2026now202820302032203428%EXPECTED2036203820402042 Developer-announced COD: 2028 ANNOUNCED 2028
COD probability by year, conditional on completion
YearProbability
203314.1%
2034 (expected)28.0%
203522.7%
203614.6%
20378.7%
20385.1%
20393.1%
20401.8%
20411.1%
20420.7%
How Hafrok got this date
1
No dated milestone yet
Nothing is consented or financed with a date, so the estimate starts from today (2026), adds the time similar projects (in developing offshore-wind markets) took from consent to operation, plus an allowance for obtaining consent.
2
Earliest credible date
Typical consent-to-operation time plus allowances means commercial operation before 2034 is not credible.
3
Result
Expected commercial operation 2034, likely range 2034–2039 (the middle half of outcomes for similar projects). With no milestone to build from, the earliest credible date is the estimate, with a deliberately wide range.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Early Development projects that went on to complete — ≈61%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). About three in four early-stage projects with a final outcome went on to operate — a record from an easier era. Most of today's early pipeline is still unresolved, so the estimate discounts it. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈60%, which rates it Prospective on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline verified milestones only — each date carries its provenance mark

2021’22’23’24’25’26’27’28’29’30’31’32’33’34Developer-announced COD: 2028 announced COD 2028View the source for Consent appliedConsent applied Jul 2020 Commercial operation 2034 ·Hafrok expected
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD.

Revenue & offtake contract duration and price levels · money of the day

99 MW contracted — utility PPA
Utility PPA · South Korea 2025 H1 Offshore Wind Auction (public-led + general)
Priceprice undisclosed ·Capacity99 MWAwardedSep 2025
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageEarly Development
Offshore constructionnot started
Expected start of operation2028

Sources & verification

2/11 fields verified · rests on 10 sources · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[2]
BusinessKorea2026-04◆ Macquarie Exits Korea Offshore Wind, Scr…
supportsoperatorowner
[7]
The Korea Times2026-04-13
supportsBackground
Auction results1
[11]
Shin and Kim2026-06-22◆ kr-rps-wind-2025h1-offshore-kr-rps-terms
Korea RPS fixed-price offshore: completion-period bands 60/72/78 months; REC-price cut / cancellation on miss
supportsUtility PPA · South Korea 2025 H1 Offshore Wind Auction (public-led + general)
Trade press6
[3]
Offshore Wind Biz2025
Press report — cited, not quoted; read it at the source link.
supportsUnit capacityTotal capacityMechanismDetail
[4]
4C Offshore2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[5]
GEBCO Compilation Group2020
supportsWater depth
[8]
Busan Ilbo (부산일보)2026-05-20
supportsBackground
[9]
Yonhap News (연합뉴스)2025-03-16
“2020년 7월 발전사업허가를 받은 다대포 해상풍력사업은 해양 물리탐사·지반조사, 수중 문화재지표조사, 해양 교통안전진단 등 까다로운 해상풍력 인허가를 차례로 통과했고 환경영향평가와 최종 인허가 단계만 남겨두고 있다.”
supportsConsentSite rightsConsent applied
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown◆ South Korea Awards 689 MW of Offshore Wi…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationUnit capacityTotal capacityWater depthCoordinates