Abalone Offshore Wind Farm (Deep Wind / KHNP)

Deep Wind Offshore (Norwegian) partnering with KHNP for local content. Abalone located in southwest Korea.

Status
Proposedlifecycle stage
Ownership
BPBP — 55% 
Deep Wind Offshore — 45% 
Location
South Korea
Yellow Sea
Technology
Capacity 1,500 MW 
Turbines
Foundation
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project 
Water depth 41–76 m  Wind speed 8.5 m/s @ 150 m 
Revenue & grid
Offtake Other 
Grid
Schedule
FID Not taken
COD · developer 2032 announced 

Delivery outlook not forecast

We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.

Revenue & offtake route to market — open

No offtake secured — route to market open

Public Waters Occupancy and Use Permit (PWOP) granted March 2025

The routes describe what exists in this market — not a prediction of which the project will take.
Next visible round · from the auction calendar
South Korea 2026 H2 Offshore Wind Auction
expected H2 2026 · planned · the round’s published documents do not name this project
MCEE's ten-year roadmap (2026-06-30) schedules 1.7-3.0 GW for 2026 H2 — fixed 1.3-2.0 GW, floating 0.4-1.0 GW. No 공고 date published as of 2026-08-26; the ministry began collecting military-operability consultation requests for H2 bidders from April 2026.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operation2032

Sources & verification

0/10 fields verified · rests on 6 sources · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction pipeline1
[6]
기후에너지환경부 (MCEE), via 대한민국 정책브리핑 (korea.kr)2026-06-30◆ kr-mcee-roadmap-2026
Roadmap table, 2026 H2 column: 경쟁입찰 물량 1.7~3.0 GW (고정식 1.3~2.0, 부유식 0.4~1.0). "RPS 제도 일몰('27.1.1.)에 따라 '27년 이후 입찰에 대한 세부 운영 방식 및 선정 프로세스 구체화 필요 ('26년 하반기 중)."
supportsSouth Korea 2026 H2 Offshore Wind Auction
Trade press4
[2]
GEM2026
supportsoperatorownerTotal capacityCoordinates
[3]
GEBCO Compilation Group2020
supportsWater depth
[4]
Enerdata
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetailOfftake history
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsConsentCommercial operationTotal capacityWater depthCoordinates