Oga Katagami Akita Offshore Wind (Round 2)

Located in the Sea of Japan off Oga Peninsula, Akita. Fixed-bottom monopile in ~20-40 m depth. Final deposits paid confirming Round 2 award.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
OKOga Katagami Akita Offshore Green Energy LLC — 100% 
Location
Japan
Sea of Japan (East Sea)
Technology
Capacity 315 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Japan Offshore Wind Round 2 (general sea-area public solicitation) · 2023 ·
Water depth 7–27 m  Wind speed 7.6 m/s @ 150 m 
Revenue & grid
Offtake Premium · 3 JPY_per_kWh  Grid Not recorded  Connection Akita Substation, Tohoku Electric Power grid 
Schedule
FID Not taken
COD · announced Jun 2028 
COD · Hafrok 2031 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2031
expected year of commercial operation
The developer says 2028-06; Hafrok expects 2031 — 3 years later.
Chance of delivery
≈77% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract lifts this one above that; a market with a thinner delivery record and technical complexity pull the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2030: 14.1% (conditional on completion) 2031: 28.0% (conditional on completion) 2032: 22.7% (conditional on completion) 2033: 14.6% (conditional on completion) 2034: 8.7% (conditional on completion) 2035: 5.1% (conditional on completion) 2036: 3.1% (conditional on completion) 2037: 1.8% (conditional on completion) 2038: 1.1% (conditional on completion) 2039: 0.7% (conditional on completion)2026now20282030203128%EXPECTED2032203420362038 Developer-announced COD: 2028 ANNOUNCED 2028
COD probability by year, conditional on completion
YearProbability
203014.1%
2031 (expected)28.0%
203222.7%
203314.6%
20348.7%
20355.1%
20363.1%
20371.8%
20381.1%
20390.7%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2031; the faster quarter of similar projects would be done by 2029, the slower quarter not until 2031.
3
Result
Expected commercial operation 2031, likely range 2029–2031 (the middle half of outcomes for similar projects). The developer's announced date (2028) is earlier than similar projects have managed — Hafrok's own date is used and the difference is flagged above.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈77%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2024’25’26’27’28’29’30’31Developer-announced COD: 2028-06 announced COD Jun 2028View the source for Consent appliedConsent applied Dec 2023 Japan Offshore Wind Round 2 (general sea-area public solicitation) — awarded to JERA / J-Power / Itochu / Tohoku EPCOJapan Offshore Wind Round 2 (general sea-area public solicitation) Dec 2023 · auction recordCommercial operation 2031 ·Hafrok expectedJapan Offshore Wind Round 2 (general sea-area public solicitation) — awarded to JERA / J-Power / Itochu / Tohoku EPCO 2023-12 ORIGINATIONTransfer(s) not in Hafrok's record — shown as a gap, never guessed. UNRECORDEDTODAYJERA Co. Inc. JERA Co. Inc. JERA Co. Inc. not among today’s recorded owners — no sale recordedJ-Power / Electric Power Development Co. J-Power / Electric Powe… J-Power / Electric Powe… exited 2023-12Tohoku Electric Power Co. Tohoku Electric Power C… Tohoku Electric Power C… exited 2023-12ITOCHU Corporation ITOCHU Corporation ITOCHU Corporation exited 2023-12Oga Katagami Akita Offshore Green Energy LLC — 100% today · operator Oga Katagami Akita Offs… Oga Katagami Akita Offs… 100%Japan Offshore Wind Round 2 (general sea-area public solicitation) — awarded to JERA / J-Power / Itochu / Tohoku EPCO Transfer(s) not in Hafrok's record — shown as a gap, never guessed.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

315 MW contracted — tender award
Tender award · Japan Offshore Wind Round 2 (general sea-area public solicitation)
Price3 JPY/kWh ·Capacity315 MWAwardedDec 2023
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2028-06

Sources & verification

2/12 fields verified · rests on 12 sources · ◆ 6 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[7]
Oga Katagami Akita Offshore Green Energy LLC (project operator website)2024-02◆ Company Overview | Oga Katagami Akita Of…
“JERA Nex bp Japan GK … Electric Power Development Co., Ltd. … Tohoku Electric Power Co., Inc. … ITOCHU Corp. … Establishment Date: February 2, 2024”
supportsoperator↳ parents
OEM1
[5]
Vestas Wind Systems2024-12◆ Vestas wins 315 MW offshore order in Jap…
“Vestas has received a 315 MW order ... our first firm order for a project to be developed under the Japanese government's offshore wind auctions. ... 21 V236-15.0 MW ... Delivery of the turbines is ex…”
supportsTotal capacity
Auction results1
[11]
Aquilo Energy / EEAS2026-06-22◆ jp-round2-2023-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsTender award · Japan Offshore Wind Round 2 (general sea-area public solicitation)
Record source1
[12]
DEME Group2026-05-29◆ deme-oga-katagami-akita-2026-05
Through its Japanese joint venture Japan Offshore Marine (JOM), DEME has secured a contract for the Oga-Katagami-Akita Offshore Wind Project. The contract covers the engineering works and vessel chart…
supportsVessel — turbine installation
Trade press7
[2]
Sustainable Japan2023-12-17◆ 【日本】経産省と国交省、洋上風力事業者選定ラウンド2結果発表。3区域とも最低価格…
“男鹿・潟上・秋田Offshore Green Energyコンソーシアム(JERA、電源開発、伊藤忠商事、東北電力)… 発電設備出力:31.5万kW(着床式/1.5万kW×21基/Vestas製)、運転開始時期:2028年6月(予定)”
supportsCommercial operationTotal capacity
[3]
Orrick, Herrington & Sutcliffe LLP2023-12
“all three applicants for the offshore areas of Oga City, Katagami City and Akita City bid at 3 yen/kWh … the FIP period is 20 years”
supportsMechanismStrike / priceDetail
[4]
Offshore Wind Biz2023-12-13
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[6]
DeepWind (Japan offshore wind intelligence)2025-09-24◆ Akita Oga Katagami Akita City Offshore W…
“The project remains in the Environmental Impact Assessment phase, currently at the 'draft report' stage as of September 24, 2025. Construction Start: March 2026. Commercial Operation Date: June 2028.”
supportsConsentCommercial operationStatusConnection pointConsent applied
[8]
Global Energy Monitor (GEM.wiki)2026-07-02
supportsCoordinates
[9]
GEBCO Compilation Group2020
supportsWater depth
[10]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates