Oga Katagami Akita Offshore Wind (Round 2)
Located in the Sea of Japan off Oga Peninsula, Akita. Fixed-bottom monopile in ~20-40 m depth. Final deposits paid confirming Round 2 award.
Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
OKOga Katagami Akita Offshore Green Energy LLC — 100% ◇
Location
Sea of Japan (East Sea)
Technology
Capacity
315 MW ◆
Turbines
—
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Origination
Japan Offshore Wind Round 2 (general sea-area public solicitation) · 2023 ·
Water depth
7–27 m ≈
Wind speed
7.6 m/s @ 150 m ≈
Revenue & grid
Offtake
Premium · 3 JPY_per_kWh ◇
Grid
Not recorded ◇
Connection
Akita Substation, Tohoku Electric Power grid ◇
Schedule
FID
Not taken
COD · announced
Jun 2028 ◇
COD · Hafrok
2031 expected
Delivery outlook modelled by Hafrok · calibrated on delivered projects
2031
expected year of commercial operation
The developer says 2028-06; Hafrok expects 2031 — 3 years later.
Chance of delivery
≈77%
estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract lifts this one above that; a market with a thinner delivery record and technical complexity pull the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
| Year | Probability |
|---|---|
| 2030 | 14.1% |
| 2031 (expected) | 28.0% |
| 2032 | 22.7% |
| 2033 | 14.6% |
| 2034 | 8.7% |
| 2035 | 5.1% |
| 2036 | 3.1% |
| 2037 | 1.8% |
| 2038 | 1.1% |
| 2039 | 0.7% |
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in
2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of
2031; the faster quarter of similar projects would be done by 2029, the slower quarter not until 2031.3
Result
Expected commercial operation
2031, likely range 2029–2031 (the middle half of outcomes for similar projects). The developer's announced date (2028) is earlier than similar projects have managed — Hafrok's own date is used and the difference is flagged above.4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈77%, which rates it
Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
Origination · 2023-12
Japan Offshore Wind Round 2 (general sea-area public solicitation)
- Awarded to
- JERA / J-Power / Itochu / Tohoku EPCO
- Basis
- integrated tender
Founding JV · 2023-12
JERA Co. Inc. · J-Power / Electric Power Development Co. · Tohoku Electric Power Co. · ITOCHU Corporation — On 13 December 2023, the Japan Ministry of Economy, Trade and Industry (METI) and Ministry of Land, Infrastructure, Transport and Tourism (MLIT) selected the consortium of JERA Co. Inc. (lead, reference company), J-Power / Electric Power Development Co., Tohoku Electric Power Co., and ITOCHU Corporation as the winner of the offshore wind auction for the sea area off Oga City, Katagami City, and Akita City, Akita Prefecture (Round 2). The project company is Oga Katagami Akita Offshore Green Energy LLC ("OKAOGE"). Planned capacity: 315 MW (21 × 15 MW Vestas turbines). Committed COD: 30 June 2028. Bid price: JPY 3/kWh (the minimum qualifying price). No consideration was exchanged between consortium members; they jointly bid on the auction.
Evidence
- jera.co.jp — JERA, J-POWER, Tohoku Electric Power, and ITOCHU Selected as Business Operators for an Offshore Wind Power Project Off Oga City, Katagami City, and Akita City in Akita Prefecture - Press Release(2023) ↗ 2023-12 ◆ held
- itochu.co.jp — JERA, J-POWER, Tohoku Electric Power, and ITOCHU Selected as Business Operators for an Offshore Wind Power Project Off Oga City, Katagami City, and Akita City in Akita Prefecture | Press Releases | ITOCHU Corporation ↗ 2023-12 ◆ held
- okaoge.co.jp — Company Overview | Oga Katagami Akita Offshore Green Energy LLC ↗ ◆ held
- japanenergyhub.com — JERA-led consortium submits draft EIA for 315MW 2nd offshore wind auction project, orders Vestas turbines ↗ 2023-12 ◆ held
- whitecase.com — Japan Offshore Wind Update - Round 2 Results & Round 3 Process ↗ 2024-03 ◆ held
From the auction results — the round that created the project; founding JV from Hafrok’s transactions record.
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake contract duration and price levels · money of the day
315 MW contracted — tender award
● Tender award · Japan Offshore Wind Round 2 (general sea-area public solicitation)
Price3 JPY/kWh ·Capacity315 MWAwardedDec 2023Term20 yrs
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2028-06
Installation contracts
Turbinesvessel not yet named◇ContractedSources & verification
2/12 fields verified · rests on 12 sources · ◆ 6 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[7]
Oga Katagami Akita Offshore Green Energy LLC (project operator website)2024-02◆ Company Overview | Oga Katagami Akita Of…
“JERA Nex bp Japan GK … Electric Power Development Co., Ltd. … Tohoku Electric Power Co., Inc. … ITOCHU Corp. … Establishment Date: February 2, 2024”
supportsoperator↳ parents
OEM1
[5]
Vestas Wind Systems2024-12◆ Vestas wins 315 MW offshore order in Jap…
“Vestas has received a 315 MW order ... our first firm order for a project to be developed under the Japanese government's offshore wind auctions. ... 21 V236-15.0 MW ... Delivery of the turbines is ex…”
supportsTotal capacity
Auction results1
[11]
Aquilo Energy / EEAS2026-06-22◆ jp-round2-2023-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsTender award · Japan Offshore Wind Round 2 (general sea-area public solicitation)
Record source1
[12]
DEME Group2026-05-29◆ deme-oga-katagami-akita-2026-05
Through its Japanese joint venture Japan Offshore Marine (JOM), DEME has secured a contract for the Oga-Katagami-Akita Offshore Wind Project. The contract covers the engineering works and vessel chart…
supportsVessel — turbine installation
Trade press7
[2]
Sustainable Japan2023-12-17◆ 【日本】経産省と国交省、洋上風力事業者選定ラウンド2結果発表。3区域とも最低価格…
“男鹿・潟上・秋田Offshore Green Energyコンソーシアム(JERA、電源開発、伊藤忠商事、東北電力)… 発電設備出力:31.5万kW(着床式/1.5万kW×21基/Vestas製)、運転開始時期:2028年6月(予定)”
supportsCommercial operationTotal capacity
[3]
Orrick, Herrington & Sutcliffe LLP2023-12
“all three applicants for the offshore areas of Oga City, Katagami City and Akita City bid at 3 yen/kWh … the FIP period is 20 years”
supportsMechanismStrike / priceDetail
[4]
Offshore Wind Biz2023-12-13
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[6]
DeepWind (Japan offshore wind intelligence)2025-09-24◆ Akita Oga Katagami Akita City Offshore W…
“The project remains in the Environmental Impact Assessment phase, currently at the 'draft report' stage as of September 24, 2025. Construction Start: March 2026. Commercial Operation Date: June 2028.”
supportsConsentCommercial operationStatusConnection pointConsent applied
[8]
[9]
[10]
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates