Nyuzen Offshore Wind Farm
Located offshore Nyuzen Town, Toyama Prefecture. Installation by Shimizu Corp vessel Blue Wind.
Status
Operationallifecycle stage
Ownership
VJVenti Japan — 100% ◇
Location
Sea of Japan (East Sea)
Technology
Capacity
9 MW ◇
Turbines
3 × 3 MW ◆
Model
Mingyang Myse3 0-135 ◇
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–17 m ≈
Wind speed
6.0 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◇
Grid
Not recorded ◇
Connection
Grid connection secured ◇
Schedule
FID
Taken · date not recorded ∴
COD
22 Sep 2023 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime: Japan FIT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2023-09-22
Offshore construction2023-04-03 → 2023-09-22
Sources & verification
3/14 fields verified · rests on 10 sources (1 primary)
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[5]
JFE Engineering Corporation2023-10-17
“本年9月22日より運転を開始いたしました ... 2022年10月から建設工事を進めていた ... 3,000kW級風車を3基設置(出力制御により最大出力7,495kWとして運用)”
supportsConsentFinal investment decisionOnshore constructionOffshore constructionFirst power+4 more
Trade press8
[2]
4C Offshore (TGS)2026-07-02
Press report — cited, not quoted; read it at the source link.
supportsoperatorMechanismDetailStatusConnection point+1 more
[3]
[4]
offshoreWIND.biz2023
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[6]
WindJournal2023-09-01
“4月3日から風車の基礎を海底に打設する工事を開始した”
supportsOnshore constructionOffshore constructionSite rights
[7]
WindJournal2023-10-23
“3基の風車の商業運転を9月22日に開始した ... 10月17日には関係者が出席して完成を祝う式典が開かれた”
supportsCommercial operation
[8]
[9]
[10]
環境金融研究機構 (RIEF)2023
“明陽智慧能源集団(明陽智能)が開発した設備を、日本で初めて採用した...一基3000kW級の発電タービン3基で構成する”
supportsTurbinesModel
Unverified import1
[1]
unknown
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depthCoordinates