Noshiro Port Offshore Wind Farm
Part of Akita Offshore Wind Corporation (AOW). Monopiles supplied by SIF Group.
Status
Operationallifecycle stage
Ownership
AOAkita Offshore Wind Corporation — 100% ◆
Location
Sea of Japan (East Sea)
Technology
Capacity
84 MW ◇
Turbines
20 × 4.2 MW ◆
Model
Vestas V117 4-2 ◆
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
6–31 m ≈
Wind speed
7.3 m/s @ 100 m ≈
Revenue & grid
Offtake
PPA ◆
Grid
Not recorded ◆
Connection
Grid connection secured ◆
Schedule
FID
2020 ◆
COD
2022-Q4 ◆
Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record
JV formation · 2015-02
Marubeni · Obayashi Corporation · Tohoku Electric Power · Cosmo Eco Power · Kansai Electric Power · Chubu Electric Power · The Akita Bank · Ohmori Co. · Sawakigumi Corporation · Kyowa Oil · Katokensetsu · Kanpu · Sankyo stake not disclosed
- Stake
- not disclosed
- Consideration
- not disclosed
- Announced
- 2015-02
- Closed
- 2020-02
- Project stage
- early development
Companion record to Akita Port Offshore Wind Farm. Same Marubeni-led AOW consortium (Akita Offshore Wind Corporation) covers both the Akita Port (55 MW) and Noshiro Port (84 MW) sites as one integrated FIT project in Akita Prefecture. FIT award 2015, FID February 2020. Consortium structure identical to Akita Port record above. Noshiro Port (84 MW, 20 turbines, Vestas V117-4.2MW) commenced commercial operations on 22 December 2022.
Evidence
- aow.co.jp — OUR PROJECT/Akita Offshore Wind Corporation (AOW) ↗ 2015-02 ◆ held
- Marubeni Corporation — Commencement of Commercial Operation of the Offshore Wind Farm Project at Akita Port and Noshiro Port in Akita Prefecture ↗ 2022-12-22 ◆ held
- marubeni.com — Commencement of full-scale Commercial Operation for Offshore Wind Farm Project at Akita Port and Noshiro Port in Akita Prefecture ↗ 2015-02 ◆ held
- constructionreviewonline.com — The Akita Noshiro offshore wind farm project timeline and all you need to know ↗ 2015-02 ◆ held
From Hafrok’s transactions record
Dashed tick marks today (9 Sep 2026). Ownership lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Revenue & offtake the regime the project was built under
Offtake regime: Japan FIT (20-year PPA with Tohoku Electric)
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2022-Q4
Sources & verification
7/14 fields verified · rests on 9 sources (5 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Regulator1
[9]
Operator2
[4]
Marubeni Corporation2022-12-22◆ Commencement of Commercial Operation of …
“Marubeni is pleased to announce that it started commercial operation based on the feed-in tariff program for renewable energy (hereinafter, "FIT") at the Noshiro Port Offshore Wind Farm on December 22…”
supportsoperatorFinal investment decisionConstruction startCommercial operationSite rights+4 more
[12]
Akita Offshore Wind Corporation
“Marubeni Corporation, OBAYASHI CLEAN ENERGY CORPORATION, Tohoku Electric Power Co.,Inc., Cosmo Eco Power Co., Ltd., The Kansai Electric Power Co., Inc., Chubu Electric Power Co., Inc., The Akita Bank,…”
supports↳ parents
OEM1
[11]
Mitsubishi Heavy Industries (MHI Vestas Offshore Wind A/S order announcement)2020-03-19
“MHIヴェスタス(MHI Vestas Offshore Wind A/S)は、秋田県で進められている洋上風力発電所プロジェクト向けに、ロータ直径117m 単機出力4,200kWの洋上風力発電設備(V117-4.2MW)33基を正式に受注しました。同社の日本国内における初の正式受注となり、秋田港内に建設される「秋田洋上風力発電所」に13基、能代港内の「能代洋上風力発電所」に20基を納入する計画です…”
supportsTurbinesModelUnit capacity
Trade press4
[6]
[7]
[8]
Power Technology2023
Press report — cited, not quoted; read it at the source link.
supportsTotal capacity
[10]
Unverified import1
[1]
unknown◆ OUR PROJECT/Akita Offshore Wind Corporat…
supportsTotal capacityWater depthCoordinates