Noshiro-Mitane-Oga Offshore Wind (R1 withdrawn — re-auction)

Located off Noshiro City, Mitane Town, and Oga City, Akita. Adjacent to Happo-Noshiro (Round 2 winner). Distinct area from Round 2 designation.

Status
On Holdlifecycle stage
FragileHafrok completion outlook
Ownership
Location
Japan
Sea of Japan (East Sea)
Technology
Capacity 494 MW  Turbines 38 × 13 MW  Model GE Haliade X 
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Japan Offshore Wind Round 1 (general sea-area public solicitation) · 2021 ·
Water depth 8–30 m  Wind speed 7.7 m/s @ 150 m 
Revenue & grid
Offtake Other withdrawn 
Grid
Schedule
FID Not taken
COD · announced 2031 
COD · Hafrok

Delivery outlook modelled by Hafrok · calibrated on delivered projects

on hold — no credible date; the chart shows when a restarted project might complete
The developer's last guidance was 2031 · not treated as a schedule while the project is on hold
Chance of delivery
≈13% estimated chance this project reaches commercial operation
Projects put on hold complete ≈15% of the time on Hafrok's record. This one sits below that: a market with a thinner delivery record, technical complexity and no offtake contract yet. Only a restart would change that — there is no dated schedule to judge against.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2030: 20.0% (conditional on completion) 2031: 20.0% (conditional on completion) 2032: 20.0% (conditional on completion) 2033: 20.0% (conditional on completion) 2034: 20.0% (conditional on completion)2026now20272028202920302031203220332034 Developer-announced COD: 2031 ANNOUNCED 2031
COD probability by year, conditional on completion
YearProbability
203020.0%
203120.0%
203220.0%
203320.0%
203420.0%
How Hafrok got this date
1
On hold — no dated schedule
The project is recorded as On Hold, so no sequence of milestones can be trusted. Hafrok publishes no expected year; the chart instead spreads the remaining chance of completion over the years a restarted project might finish in.
2
Chance of delivery — separate from timing
Start from the share of On Hold projects that went on to complete — ≈15%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Historically only a minority of projects put on hold returned to delivery — the estimate reflects that. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈13%, which rates it Fragile on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Revenue & offtake route to market — open

No offtake secured — route to market open

Tender award · Japan Offshore Wind Round 1 (general sea-area public solicitation) awarded 2021-12, withdrawn. No live offtake on record.

The routes describe what exists in this market — not a prediction of which the project will take. Timing math for the auction gate lives in the delivery outlook above.
Next visible round · from the auction calendar
Japan Round 1 re-auction (Noshiro-Mitane-Oga, Yurihonjo, Choshi)
expected 2026 · planned · the round’s published documents do not name this project
The three sites a Mitsubishi-led consortium WON in Round 1 (2021) and WITHDREW from in Aug 2025 are to be re-auctioned "as early as 2026", expected before Round 4; timing not firmly fixed.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageOn Hold
Offshore constructionnot started
Expected start of operation2031

Sources & verification

0/13 fields verified · rests on 7 sources · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction results1
[6]
Aquilo Energy / EEAS2026-06-22◆ jp-round1-2021-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsOfftake history
Auction pipeline1
[7]
Shulman Advisory2026
Japan to re-auction the three Round-1 sites (Noshiro-Mitane-Oga, Yurihonjo, Choshi) dropped by Mitsubishi, as early as 2026 with a revised price-floor/ceiling framework.
supportsJapan Round 1 re-auction (Noshiro-Mitane-Oga, Yurihonjo, Choshi)
Trade press4
[2]
DeepWind2025
supportsTotal capacityMechanismDetail
[3]
GEM2026
supportsTurbinesModelUnit capacityTotal capacityCoordinates
[4]
GEBCO Compilation Group2020
supportsWater depth
[5]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsConsentCommercial operationTotal capacityWater depthCoordinates