Murakami Tainai Offshore Wind (Round 2)

Located in the Sea of Japan off Niigata Prefecture. RWE's first Japanese offshore wind project.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
M&Mitsui & Co. — 33.33% 
RORWE Offshore Wind Japan Murakami-Tainai K.K. — 33.33% 
OGOsaka Gas Co. — 33.34% 
Location
Japan
Sea of Japan (East Sea)
Technology
Capacity 684 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Japan Offshore Wind Round 2 (general sea-area public solicitation) · 2023 ·
Water depth 62–81 m  Wind speed 7.1 m/s @ 150 m 
Revenue & grid
Offtake Premium · 3 JPY_per_kWh 
Grid
Schedule
FID Not taken
COD · announced Jun 2029 
COD · Hafrok 2029 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2029
expected year of commercial operation
Chance of delivery
≈74% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; a market with a thinner delivery record, its size and technical complexity pull a little the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2028: 3.9% (conditional on completion) 2029: 50.2% (conditional on completion) 2030: 29.5% (conditional on completion) 2031: 10.6% (conditional on completion) 2032: 3.8% (conditional on completion) 2033: 1.4% (conditional on completion) 2034: 0.6% (conditional on completion)2026now20272028202950%20302031203220332034 Developer-announced COD: 2029 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2029
COD probability by year, conditional on completion
YearProbability
20283.9%
2029 (expected)50.2%
203029.5%
203110.6%
20323.8%
20331.4%
20340.6%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2031; the faster quarter of similar projects would be done by 2029, the slower quarter not until 2031.
3
Result
Expected commercial operation 2029, likely range 2029–2031 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈74%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2024’25’26’27’28’29Developer-announced COD: 2029-06 announced COD Jun 2029Japan Offshore Wind Round 2 (general sea-area public solicitation) — awarded to Mitsui / RWE / Osaka GasJapan Offshore Wind Round 2 (general sea-area public solicitation) Dec 2023 · auction recordView the source for Consent appliedConsent applied Dec 2024 Commercial operation 2029 ·Hafrok expectedJapan Offshore Wind Round 2 (general sea-area public solicitation) — awarded to Mitsui / RWE / Osaka Gas 2023-12 ORIGINATIONTODAYRWE Offshore Wind Japan Murakami-Tainai K.K. — 33.33% today RWE Offshore Wind Japan… RWE Offshore Wind Japan… 33.33%Mitsui & Co. — 33.33% today · developer Mitsui & Co. Mitsui & Co. 33.33%Osaka Gas Co. — 33.34% today Osaka Gas Co. Osaka Gas Co. 33.34%Japan Offshore Wind Round 2 (general sea-area public solicitation) — awarded to Mitsui / RWE / Osaka Gas
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

684 MW contracted — tender award
Tender award · Japan Offshore Wind Round 2 (general sea-area public solicitation)
Price3 JPY/kWh ·Capacity684 MWAwardedDec 2023
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2029-06

Sources & verification

4/11 fields verified · rests on 9 sources (1 primary) · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[2]
METI / MLIT2023-12-13◆ Round 2 offshore wind operator selection…
“(2)新潟県村上市及び胎内市沖 [1]事業者名(コンソーシアム):村上胎内洋上風力コンソーシアム [2]構成員:三井物産株式会社、RWE Offshore Wind Japan 村上胎内株式会社、大阪瓦斯株式会社 [3]事業計画概要 ・発電設備:着床式洋上風力発電 ・発電設備出力:68.4万kW (1.8万kW×38基、GE製) ・運転開始予定時期:2029年6月”
supportsCommercial operationTotal capacity
[3]
METI / MLIT2024-12-06
“「秋田県男鹿市、潟上市及び秋田市沖」、「新潟県村上市及び胎内市沖」及び「長崎県西海市江島沖」における洋上風力発電事業について公募占用計画を認定しました”
supportsConsentConsent applied
[6]
Mitsui & Co.2023-12◆ Mitsui secures 684-megawatt project toge…
supportsdeveloperowner
Auction results1
[12]
Aquilo Energy / EEAS2026-06-22◆ jp-round2-2023-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsTender award · Japan Offshore Wind Round 2 (general sea-area public solicitation)
Trade press4
[5]
Shulman Advisory2023-12
“Mitsui, RWE Offshore Japan and Osaka Gas won the bid to construct 38 wind turbines with a total capacity of 684MW at JPY3/KWh.”
supportsMechanismStrike / priceDetail
[7]
Global Energy Monitor (GEM.wiki)2026-07-02
supportsCoordinates
[8]
GEBCO Compilation Group2020
supportsWater depth
[9]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown
supportsTotal capacityWater depthCoordinates