Kamisu Nearshore Phase 2
Located adjacent to Phase 1 off Kashima Port, Ibaraki Prefecture.
Status
Operationallifecycle stage
Ownership
WCWind Power Co — 100% ◇
Location
Northwest Pacific
Technology
Capacity
16 MW ◆
Turbines
8 × 2 MW ◆
Foundation
—
Site & conditions
Site rights
Seabed rights held ∴
Water depth
3–11 m ≈
Wind speed
6.9 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Not recorded ◆
Connection
Grid connection secured ◆
Schedule
FID
Taken · date not recorded ∴
COD
2013-Q4 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime: Japan FIT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
built before satellite radar could be used to count it (the archive begins in 2014)
Installation · on record
StageOperational
In operation since2013-Q4
Sources & verification
6/13 fields verified · rests on 8 sources (2 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[6]
Wind Power Co., Ltd. (ウィンド・パワー株式会社)
“稼働開始 平成25年3月 ... 出力2,000kW × 8基/ 総出力16,000kW”
supportsFirst powerTurbinesUnit capacity
[7]
[8]
国土交通省 関東地方整備局 鹿島港湾・空港整備事務所 (MLIT Kashima Port and Airport Development Office)2018-04
“発電を行う風車は護岸から約50mの位置に建設されており、第1発電所の7基と第2発電所の8基、合計15基が現在稼働しています。”
supportsTurbines
Trade press3
[3]
[4]
4C Offshore2023◆ Kamisu Nearshore Wind Farm - phase 2 Off…
Press report — cited, not quoted; read it at the source link.
supportsConsentFinal investment decisionCommercial operationSite rightsTotal capacity+4 more
[5]
4C Offshore2026
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
Unverified import1
[1]
unknown◆ Kamisu Nearshore Wind Farm - phase 2 Off…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depth
Encyclopaedic1
[2]