Goto Floating Offshore Wind Farm

Located 7-11km offshore Kabashima Island, Goto City, Nagasaki Prefecture. First project to COD under Marine Renewable Energy Act.

Status
Operationallifecycle stage
Ownership
TCToda Corporation — 16.67% 
ERENEOS Renewable Energy — 16.67% 
OGOsaka Gas — 16.67% 
ICINPEX Corporation — 16.67% 
KEKansai Electric Power — 16.67% 
CEChubu Electric Power — 16.65% 
Location
Japan
East China Sea
Technology
Capacity 17 MW  Turbines 8 × 2.1 MW  Model Hitachi Htw 2-1 
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Goto City (Nagasaki) Floating Offshore Wind Solicitation · 2021 ·
Water depth 11–20 m 
Revenue & grid
Offtake FiT  Grid Not recorded  Connection Grid connection secured 
Schedule
FID Taken · date not recorded  COD 2026-Q1 

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2022’23’24’25’26Goto City (Nagasaki) Floating Offshore Wind Solicitation — awarded to Goto Floating Wind Farm LLC (Toda Corporation lead + ENEOS RE, Osaka Gas, INPEX, Kansai EPCO, Chubu EPCO)Goto City (Nagasaki) Floating Offshore Wind Solicitation Jun 2021 · auction recordView the source for Consent grantedConsent granted 26 Apr 2022 View the source for Onshore constructionOnshore construction 2022 View the source for First powerFirst power Jan 2026 View the sources for Commercial operationCommercial operation 2026-Q1 Goto City (Nagasaki) Floating Offshore Wind Solicitation — awarded to Goto Floating Wind Farm LLC (Toda Corporation lead + ENEOS RE, Osaka Gas, INPEX, Kansai EPCO, Chubu EPCO) 2021-06 ORIGINATIONTODAYToda Corporation — 16.67% today · operator Toda Corporation Toda Corporation 16.67%ENEOS Renewable Energy — 16.67% today ENEOS Renewable Energy ENEOS Renewable Energy 16.67%Osaka Gas — 16.67% today Osaka Gas Osaka Gas 16.67%INPEX Corporation — 16.67% today INPEX Corporation INPEX Corporation 16.67%Kansai Electric Power — 16.67% today Kansai Electric Power Kansai Electric Power 16.67%Chubu Electric Power — 16.65% today Chubu Electric Power Chubu Electric Power 16.65%Goto City (Nagasaki) Floating Offshore Wind Solicitation — awarded to Goto Floating Wind Farm LLC (Toda Corporation lead + ENEOS RE, Osaka Gas, INPEX, Kansai EPCO, Chubu EPCO)
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

17 MW contracted — tender award
Tender award · Goto City (Nagasaki) Floating Offshore Wind Solicitation
Price36 JPY/kWh ·Capacity16.8 MWAwardedJun 2021
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2026-Q1

Sources & verification

5/11 fields verified · rests on 10 sources (3 primary) · ◆ 3 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[5]
Toda Corporation2022-04-26
“本日、経済産業省及び国土交通省より、再エネ海域利用法に基づき建設する洋上風力発電所として、国内で初めて公募占用計画の認定を受けました。”
supportsConsentConsent granted
[6]
Chubu Electric Power2026-01-05
“2026年1月5日より開始したことをお知らせいたします ... 発電した電気は、エネルギーの地産地消の観点から、地域の小売電気事業者に優先して供給することとしています”
supportsFinal investment decisionFirst powerCommercial operation
[7]
Toda Corporation2026-01-05
“浮体式洋上風力発電設備 16.8MW(=2.1MW機×8基)(全長176.1m、ローター径80m)”
supportsTurbinesUnit capacity
Auction results1
[10]
Aquilo Energy / EEAS2026-06-22◆ jp-goto-floating-2021-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsTender award · Goto City (Nagasaki) Floating Offshore Wind Solicitation
Trade press5
[2]
offshoreWIND.biz2026-01◆ Japan's First Commercial Floating Wind F…
Press report — cited, not quoted; read it at the source link.
supportsoperatorownerMechanismDetail
[3]
GEBCO Compilation Group2020
supportsWater depth
[4]
offshoreWIND.biz2026
Press report — cited, not quoted; read it at the source link.
supportsOnshore constructionCommercial operationTotal capacityStatusConnection point
[8]
Nikkei2026-01
Press report — cited, not quoted; read it at the source link.
supportsModel
[9]
WindJournal2026
“日立製作所製の風車を据え付けている...出力2100kWの風車を8基設置し、総出力は1万6800kWである”
supportsModel
Unverified import1
[1]
unknown◆ Japan's First Commercial Floating Wind F…
Press report — cited, not quoted; read it at the source link.
supportsTotal capacityWater depth