Aomori South Tsugaru Offshore Wind (Round 3)

Located in the Sea of Japan off southern Aomori Prefecture, Tsugaru area. JERA-led consortium.

Status
Advanced Developmentlifecycle stage
ExpectedHafrok completion outlook
Ownership
JCJERA Co., Inc. — 33.33% 
GIGreen Power Investment Co., Ltd. — 33.33% 
TETohoku Electric Power Co., Inc. — 33.34% 
Location
Japan
Sea of Japan (East Sea)
Technology
Capacity 615 MW 
Turbines
Foundation
Site & conditions
Site rights Seabed rights held 
Origination Japan Offshore Wind Round 3 (general sea-area public solicitation) · 2024 ·
Water depth 12–41 m  Wind speed 8.0 m/s @ 150 m 
Revenue & grid
Offtake Premium · 3 JPY_per_kWh 
Grid
Schedule
FID Not taken
COD · announced Jun 2030 
COD · Hafrok 2030 expected

Delivery outlook modelled by Hafrok · calibrated on delivered projects

2030
expected year of commercial operation
Chance of delivery
≈75% estimated chance this project reaches commercial operation
Advanced Development projects complete ≈75% of the time on Hafrok's record. A secured offtake contract lifts this one slightly; a market with a thinner delivery record, its size and technical complexity pull a little the other way.
COD outlook
If it completes, when — Hafrok’s probability by year (teal)
20%40%60%80%100% 2029: 3.9% (conditional on completion) 2030: 50.2% (conditional on completion) 2031: 29.5% (conditional on completion) 2032: 10.6% (conditional on completion) 2033: 3.8% (conditional on completion) 2034: 1.4% (conditional on completion) 2035: 0.6% (conditional on completion)2026now202720282029203050%20312032203320342035 Developer-announced COD: 2030 — in line with Hafrok’s expected year ANNOUNCED = EXPECTED 2030
COD probability by year, conditional on completion
YearProbability
20293.9%
2030 (expected)50.2%
203129.5%
203210.6%
20333.8%
20341.4%
20350.6%
How Hafrok got this date
1
Starting point: the last dated milestone
Consent granted in 2026. From there Hafrok adds how long similar projects (in developing offshore-wind markets) took to reach commercial operation, measured on projects that have delivered.
2
Typical timing
Starting point plus the typical remaining time gives a middle estimate of 2031; the faster quarter of similar projects would be done by 2029, the slower quarter not until 2031.
3
Result
Expected commercial operation 2030, likely range 2029–2031 (the middle half of outcomes for similar projects). The developer's announced date falls inside that likely range, so the announced date is adopted.
4
Year-by-year chart
The bars spread that estimate across years using how similar projects actually slipped against their dates — more often late than early, which is why the bars lean right.
5
Chance of delivery — separate from timing
Start from the share of Advanced Development projects that went on to complete — ≈75%, measured on Hafrok's record of delivered and abandoned projects, with an allowance held back where that record cannot yet speak (projects still unresolved, changed market conditions). Consented projects have historically completed at very high rates, but the 2023–25 downturn showed consented-but-unfinanced projects can still fail — the estimate holds back for the offtake and financing gates still ahead. Then adjust for this project's own evidence — offtake, market, size, technical complexity — to ≈75%, which rates it Expected on Hafrok's four-step delivery scale (Delivering · Expected · Prospective · Fragile).

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2025’26’27’28’29’30Developer-announced COD: 2030-06 announced COD Jun 2030Japan Offshore Wind Round 3 (general sea-area public solicitation) — awarded to Tsugaru Offshore Energy — JERA / Green Power Investment / Tohoku EPCOJapan Offshore Wind Round 3 (general sea-area public solicitation) Dec 2024 · auction recordCommercial operation 2030 ·Hafrok expectedJapan Offshore Wind Round 3 (general sea-area public solicitation) — awarded to Tsugaru Offshore Energy — JERA / Green Power Investment / Tohoku EPCO 2024-12 ORIGINATIONTODAYJERA Co., Inc. — 33.33% today · operator JERA Co. Inc. JERA Co. Inc. 33.33%Green Power Investment Co., Ltd. — 33.33% today · developer Green Power Investment … Green Power Investment … 33.33%Tohoku Electric Power Co., Inc. — 33.34% today · investor Tohoku Electric Power C… Tohoku Electric Power C… 33.34%Japan Offshore Wind Round 3 (general sea-area public solicitation) — awarded to Tsugaru Offshore Energy — JERA / Green Power Investment / Tohoku EPCO
Dashed tick marks today (9 Sep 2026). The ▲ below the spine is the developer-announced COD. The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.

Revenue & offtake contract duration and price levels · money of the day

615 MW contracted — tender award
Tender award · Japan Offshore Wind Round 3 (general sea-area public solicitation)
Price3 JPY/kWh ·Capacity615 MWAwardedDec 2024
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageAdvanced Development
Offshore constructionnot started
Expected start of operation2030-06

Sources & verification

2/11 fields verified · rests on 8 sources (2 primary) · ◆ 4 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator2
[2]
METI/MLIT (Japan Ministry of Land, Infrastructure, Transport and Tourism)2024-12◆ 報道発表資料:「青森県沖日本海(南側)」、「山形県遊佐町沖」における洋上風力発電…
“津軽未来洋上エネルギー (Aomori, 615,000kW) / 山形遊佐洋上風力合同会社 (Yuza, 450,000kW); ゼロプレミアム水準は3円/kWh. 運転開始予定時期:2030年6月.”
supportsCommercial operationTotal capacityMechanismStrike / priceDetail
[5]
JERA2024-12◆ Selected as an Offshore Wind Power Gener…
supportsoperatordeveloperinvestor
Auction results1
[10]
Aquilo Energy / EEAS2026-06-22◆ jp-round3-2024-jp-tenders-study
Japanese offshore-wind tenders study: 30-yr occupancy permit, scheduled operation <=8 years after Occupancy Plan certification
supportsTender award · Japan Offshore Wind Round 3 (general sea-area public solicitation)
Trade press4
[4]
DLA Piper LLP2024
"Selection = winning the auction. Occupancy designation = the permit from MLIT granting the right to occupy the specific sea area. These are distinct: winning the auction does not automatically grant …
supportsConsent
[6]
Global Energy Monitor (GEM.wiki)2026-07-02
supportsCoordinates
[7]
GEBCO Compilation Group2020
supportsWater depth
[8]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
Unverified import1
[1]
unknown◆ Aomori Tsugaru Offshore Wind|615MW Fixed…
supportsTotal capacityWater depthCoordinates