Saint-Brieuc

75 km2 area. Three-legged steel jacket foundations. Jackets assembled at Port of Brest.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

5 dated milestones on the spine, each with its source · 2 recorded ownership deals from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 16 sources (7 primary) · ◆ 7 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[2]
Iberdrola2024-05-28
supportsCOD history
[14]
Iberdrola2024◆ Iberdrola increases offshore wind ambiti…
“NI (2020-03-09) Iberdrola acquires 30% of Saint-Brieuc from RES and Caisse de Depots ... Avel Vor (RES and Caisse des Depots) sells its 30% equity in the EUR 2.4 billion investment project, scheduled …”
supportsowner
[18]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 855 (node--type-project) at /facades-maritimes-en-france/facade-nord-atlantique-manche-ouest/saint-brieuc — title 'Saint-Brieuc'; page text 1968 chars, hash 76669635fb992693…. Identifyin…”
supportsRegister entry
Auction results1
[24]
Commission de régulation de l'énergie / DGEC (published by the CPDP Courseulles)2026-10-13◆ fr-ao1-cahier-des-charges-full
Full AO1 cahier des charges (appel d'offres n. 2011/S 126-208873). 6.9: by T0 + 24 months the winner gives the prefect the draft authorisation applications; valid applications filed by T0 + 30 months;…
supportsTender award · France Offshore Wind Round 1 (AO1)
Trade press12
[1]
offshoreWIND.biz2024-05-28◆ 496 MW Saint-Brieuc Offshore Wind Farm F…
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesModelUnit capacityTotal capacity+4 more
[3]
offshoreWIND.biz2023-07-06
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[5]
offshoreWIND.biz2021-04-21
Press report — cited, not quoted; read it at the source link.
supportsassemblycrew transfer
[6]
offshoreWIND.biz2020-06-18
Press report — cited, not quoted; read it at the source link.
supportsFoundationassembly
[7]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityDistance from shore
[8]
Energies de la Mer2021-01-29
“AO 01 … premier appel d'offres lancé en 2011 … ministerial decree of April 6, 2012 designating Ailes Marines as the winner … 62 turbines of 8 MW each … total power of 496 Megawatts … Ailes Marines (Ib…”
supportsMechanismDetail
[10]
Renewables Now2020-05-29◆ SGRE locks order for 496-MW Saint-Brieuc…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[11]
Energies de la Mer2018-06-25
“Parc de Saint-Brieuc : le nouvel arrêt a été signé … Prefect of Côtes-d'Armor signed a new decree on June 21, 2018, regularizing the initial decree … the April 18, 2017 decree approving the convention…”
supportsConsentConsent granted
[13]
The Wind Power2026-05◆ Saint-Brieuc (France) - Wind farms - Onl…
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[15]
GEBCO Compilation Group2020
supportsWater depth
[16]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed
[23]
L'Info Durable (AFP)2021-08-06◆ Eolien en mer: retard dans les travaux d…
Copyrighted source — cited, not quoted; read it at the source link.
supportsOffshore construction
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.