Located off southeast coast of Gran Canaria, Canary Islands. Iberdrola describes total programme as up to 300 MW of clean energy off the Spanish coast.

Status
Proposedlifecycle stage
Ownership
Iberdrola — 100% ◆
Location
Spain
Northeast Atlantic
Technology
Capacity 238 MW ◇ Turbines 17 × 14 MW ◇ Foundation Floating ◇
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth 50–200 m ◇
Revenue & grid
Offtake Other ◇
Grid —
Schedule
FID Not taken
COD · developer 2032 announced ◇

Delivery outlook not forecast

We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok's transactions record

the dated milestones on the spine, each with its source · the ownership chain from Hafrok's transactions record · the developer's announced-COD history
For registered readers · register below ↓

Revenue & offtake contract terms, price levels and the route to market

the contract terms on record · price over time in money of the day · the routes to market and the next visible round
For registered readers · register below ↓

Installation how the build is going · from sourced statements and Hafrok's registers

construction status and turbines standing · vessel and port contracts · the grid connection and whether it is ready in time
For registered readers · register below ↓

Sources & verification

Rests on 8 sources · ◆ 1 document held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[1]
Iberdrola2021-06
“Iberdrola plans first industrial-scale floating offshore wind farm in Spain with an investment of more than €1 billion”
supportsCommercial operationFoundation
Auction pipeline1
[8]
MITECO (Spain)2026
RD 962/2024 framework; draft auction order consultation ran 4-24 Feb 2026 (two-sided CfD, floating, POEM zones); order not yet adopted, no call as of mid-2026. Target 1-3 GW by 2030.
supportsSpain first offshore wind auction
Trade press6
[2]
Canarias72021-06-03◆ Iberdrola prevé 17 molinos de 14 MW en e…
“17 turbines of 14 MW each... floating foundation systems (sistemas de cimentación flotante) on steel semi-submersible platforms... Area: 44 square kilometers, distance from shore: ~3 kilometres, water…”
supportsTurbinesUnit capacityFoundationWater depthoperations base
[3]
Enerdata2021-06-04
Press report — cited, not quoted; read it at the source link.
supportsConsentTotal capacity
[4]
Power Technology (GlobalData)
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacityTotal capacityFoundation
[5]
Offshore Wind Biz2026-02-04
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetailOfftake history
[6]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsoperator
[7]
Global Energy Monitor2026-07-02
supportsCoordinates
Early access

Follow the offshore wind projects that matter to you.

Hafrok's data and analysis. Free while in early access.

  • The data, in full: the project database as an Excel workbook, Hafrok's expected delivery outlook on every project still to build, the full project records, the transaction database and the developer profiles
  • Hafrok Monitor: follow projects, developers or countries, and Hafrok Monitor mails you what moved on your list, with the source and the date: every Monday morning, or as it happens
  • Hafrok Commentary: analysis of the offshore wind market, when there is something to say
Register, free.

Name and email, no password. Everything listed here opens across the site.

Registering includes news on the projects you follow (Hafrok Monitor), notices about your account, and the occasional question from me about how Hafrok works for you. Switch the Monitor off on your account page, or unsubscribe from any mail with one click. Privacy.