Saint-Brieuc

75 km2 area. Three-legged steel jacket foundations. Jackets assembled at Port of Brest.

Project timeline & ownership verified milestones on the spine · ownership from Hafrok’s transactions record

2012’13’14’15’16’17’18’19’20’21’22’23’24’25’26France Offshore Wind Round 1 (AO1) — awarded to Ailes Marines (Iberdrola)France Offshore Wind Round 1 (AO1) Apr 2012 · auction recordView the source for Consent grantedConsent granted Jun 2018 View the source for Final investment decisionFinal investment decision May 2020 View the source for First powerFirst power Jul 2023 View the source for Commercial operationCommercial operation May 2024 France Offshore Wind Round 1 (AO1) — awarded to Ailes Marines (Iberdrola) 2012-04 ORIGINATIONAvel Vor (RES Group / Banque des Territoires) → Iberdrola — 30.0% 2020-03 ACQUISITIONTODAYIberdrola — 100% today Iberdrola Iberdrola 100%Avel Vor (RES Group / Banque des Territoires) Avel Vor Avel Vor exited 2020-03France Offshore Wind Round 1 (AO1) — awarded to Ailes Marines (Iberdrola) Avel Vor (RES Group / Banque des Territoires) → Iberdrola — 30.0% 30%
Dashed tick marks today (9 Sep 2026). The teal diamond on the spine is origination — the seabed award or round that created the project. Every other ownership event lives in the band below: one station per recorded deal, dated at its label, in deal order rather than to calendar scale. Secondary trades appear only at the interchanges; grey lines are parties whose entry or exit Hafrok’s record does not hold.
Announced-COD history: 202320232024-05 · 3 recorded revisions · slipped +0.9 yr (first announced 2023)

Revenue & offtake contract duration and price levels · money of the day

496 MW contracted — tender award
Tender award · France Offshore Wind Round 1 (AO1)
Price€155/MWh ·Capacity496 MWAwardedApr 2012
Term20 yrs

Installation how the build is going · from satellite counts and Hafrok’s registers

Satellite installation tracker
counted from satellite radar images · a structure standing in the sea on a given date, not a turbine producing power · a guide, not a sourced fact
Installation · counted from satellite
Foundations62 of 62100% · first seen 2021-09-15
Turbines32 of 6252% · first seen 2023-01-17
Latest count2025-12-31from 740 satellite passes · 1 substation platform left out so the counts compare with the turbine number · the count has ended: the build is complete
Hafrok counts foundations and turbines from satellite radar images (≈): a structure is counted once it is seen standing in the sea, which is not the same as producing power. A structure first seen in the last 60 days is not yet confirmed, because on a single image a freshly set foundation and a ship holding position look alike. Substation platforms are left out so the counts compare with the number of turbines. Rows marked with a dot (·) come from Hafrok’s own registers; a supplier or contract appears only where a source states it — everything else reads “not recorded”, never guessed.
Structures standing over time · count
strong line = confirmed · light line = seen in the last 60 days, not yet confirmed · the chart counts every structure (62 turbines + 1 platform); the table counts turbines only
foundationsturbines up (a substation top being set in place counts here too)
20406063 planned (turbines and platforms)latest count 2025-12-31foundations — running total, confirmedfoundations — running total, seen in the last 60 days and not yet confirmedSep 2021 — 1 this month · 1 in totalMay 2022 — 1 this month · 2 in totalJun 2022 — 1 this month · 3 in totalJul 2022 — 9 this month · 12 in totalAug 2022 — 13 this month · 25 in totalSep 2022 — 1 this month · 26 in totalNov 2022 — 1 this month · 27 in totalJan 2023 — 0 this month · 27 in totalMay 2023 — 1 this month · 28 in totalJun 2023 — 3 this month · 31 in totalJul 2023 — 12 this month · 43 in totalAug 2023 — 8 this month · 51 in totalSep 2023 — 7 this month · 58 in totalOct 2023 — 3 this month · 61 in totalMay 2024 — 0 this month · 61 in totalJun 2024 — 0 this month · 61 in totalOct 2024 — 0 this month · 61 in totalJan 2025 — 1 this month · 62 in totalApr 2025 — 0 this month · 62 in totalMay 2025 — 0 this month · 62 in totalJun 2025 — 0 this month · 62 in totalJul 2025 — 0 this month · 62 in totalAug 2025 — 0 this month · 62 in totalSep 2025 — 1 this month · 63 in totalDec 2025 — 0 this month · 63 in totalturbines up — running total, confirmedturbines up — running total, seen in the last 60 days and not yet confirmedSep 2021 — 0 this month · 0 in totalMay 2022 — 0 this month · 0 in totalJun 2022 — 0 this month · 0 in totalJul 2022 — 0 this month · 0 in totalAug 2022 — 0 this month · 0 in totalSep 2022 — 0 this month · 0 in totalNov 2022 — 0 this month · 0 in totalJan 2023 — 1 this month · 1 in totalMay 2023 — 0 this month · 1 in totalJun 2023 — 2 this month · 3 in totalJul 2023 — 1 this month · 4 in totalAug 2023 — 1 this month · 5 in totalSep 2023 — 10 this month · 15 in totalOct 2023 — 0 this month · 15 in totalMay 2024 — 2 this month · 17 in totalJun 2024 — 1 this month · 18 in totalOct 2024 — 2 this month · 20 in totalJan 2025 — 1 this month · 21 in totalApr 2025 — 3 this month · 24 in totalMay 2025 — 1 this month · 25 in totalJun 2025 — 5 this month · 30 in totalJul 2025 — 1 this month · 31 in totalAug 2025 — 2 this month · 33 in totalSep 2025 — 0 this month · 33 in totalDec 2025 — 0 this month · 33 in total63 foundations33 turbines upSep 2021Jul 2022Nov 2022Jun 2023Sep 2023Jun 2024Apr 2025Jul 2025Dec 2025
Satellite image
Image taken2026-09-05Copernicus Sentinel-1 radar satellite, northbound pass
Farm covered100%the whole farm lies inside the image
Structures ringed63 confirmed · 0 not yet confirmedas counted on 2025-12-31 · the image is newer than the count, so a bright spot without a ring may be a structure not yet counted
Construction ports
PortPort of Brest ·assembly · quay 400 m · crane 200 t · draft 10.6 m
PortPort of Lézardrieux crew transfer
Contains modified Copernicus Sentinel data 2026, processed by ESA and by Microsoft Planetary Computer.
Latest satellite radar image · 2026-09-05
a radar picture, not a photograph: the sea is dark, steel is bright · black is beyond the edge of the image
confirmed structure (63)seen recently, not yet confirmed (0)probably a substation platform (a larger structure than a turbine; the register above has the facts)farm boundary
Satellite radar image over Saint-Brieuc, 2026-09-05
Grid connection
from Hafrok’s substation, converter and cable registers
Offshore platforms · 1
Offshore substationSaint-Brieuc Offshore Substation·225 kV · in service 2022 · owner Ailes Marines (100% Iberdrola Group) — the producer, NOT RTE
Grid connection · ready in time?
when each part of the grid connection is due, against the start date the developer states (black line) · a bar spans the whole year, quarter or month the source gives
installed or in serviceexpected deliveryearlier date that was later moved
2022202320242025developer’s stated start 2024-Q2nowSaint-Brieuc Offshore SubstationSaint-Brieuc Offshore Substationin service 2022in service 2022

Sources & verification

15/18 fields verified · rests on 15 sources (3 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator3
[2]
Iberdrola2024-05-28
supportsCOD history
[14]
Iberdrola2024◆ Iberdrola increases offshore wind ambiti…
“NI (2020-03-09) Iberdrola acquires 30% of Saint-Brieuc from RES and Caisse de Depots ... Avel Vor (RES and Caisse des Depots) sells its 30% equity in the EUR 2.4 billion investment project, scheduled …”
supportsowner
[18]
DGEC — Ministère de la Transition écologique (eoliennesenmer.fr)2026-08-25◆ French Eoliennes en mer register (DGEC),…
“Register node 855 (node--type-project) at /facades-maritimes-en-france/facade-nord-atlantique-manche-ouest/saint-brieuc — title 'Saint-Brieuc'; page text 1968 chars, hash 76669635fb992693…. Identifyin…”
supportsRegister entry
Auction results1
[19]
CRE (Commission de regulation de l'energie)2011◆ fr-ao1-tender-page
AO1 (first French round, 2011) tender page on the CRE site - the appel d'offres for 4 sites (Saint-Nazaire, Fecamp, Courseulles, Saint-Brieuc), offtake = a 20-year purchase obligation (pre-CfD).
supportsTender award · France Offshore Wind Round 1 (AO1)
Trade press11
[1]
offshoreWIND.biz2024-05-28
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTurbinesModelUnit capacityTotal capacity+4 more
[3]
offshoreWIND.biz2023-07-06
Press report — cited, not quoted; read it at the source link.
supportsFirst power
[5]
offshoreWIND.biz2021-04-21
Press report — cited, not quoted; read it at the source link.
supportsassemblycrew transfer
[6]
offshoreWIND.biz2020-06-18
Press report — cited, not quoted; read it at the source link.
supportsFoundationassembly
[7]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsTurbinesModelUnit capacityTotal capacityDistance from shore
[8]
Energies de la Mer2021-01-29
“AO 01 … premier appel d'offres lancé en 2011 … ministerial decree of April 6, 2012 designating Ailes Marines as the winner … 62 turbines of 8 MW each … total power of 496 Megawatts … Ailes Marines (Ib…”
supportsMechanismDetail
[10]
Renewables Now2020-05-29◆ SGRE locks order for 496-MW Saint-Brieuc…
Press report — cited, not quoted; read it at the source link.
supportsFinal investment decision
[11]
Energies de la Mer2018-06-25
“Parc de Saint-Brieuc : le nouvel arrêt a été signé … Prefect of Côtes-d'Armor signed a new decree on June 21, 2018, regularizing the initial decree … the April 18, 2017 decree approving the convention…”
supportsConsentConsent granted
[13]
The Wind Power2026-05◆ Saint-Brieuc (France) - Wind farms - Onl…
Press report — cited, not quoted; read it at the source link.
supportsCoordinates
[15]
GEBCO Compilation Group2020
supportsWater depth
[16]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed