Floatgen

Located at SEM-REV test site off Le Croisic, Brittany. Demonstrated BW Ideol's patented Damping Pool concrete float technology.

Project timeline verified milestones only — each date carries its provenance mark

Dashed tick marks today (9 Sep 2026).
Announced-COD history: 2018-Q32018-09-18 · 2 recorded revisions · held (announced 2018-Q3, unchanged)

Revenue & offtake the regime the project was built under

Offtake regime on record
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2018-09-18
Offshore construction2018-04 → 2018-09-18
Construction ports
PortSaint-Nazaire ·assembly · quay 780 m · crane 600 t · draft 14 m

Sources & verification

17/18 fields verified · rests on 9 sources (6 primary) · ◆ 5 documents held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator6
[1]
BW Ideol2024◆ Floating platform | Offshore wind power
“2MW capacity with Vestas V80 turbine. BW Ideol's patented Damping Pool® floating foundation (concrete barge design), 36 meters wide, 7.5 meter draught, 6 synthetic fiber (nylon) mooring lines. Constru…”
supportsTurbinesModelUnit capacityTotal capacityFoundation
[2]
Centrale Nantes / SEM-REV2024◆ FLOATGEN - SEM-REV
“Power output: 2 MW. Model: Vestas V80. Rotor diameter: 80 meters. Floating concrete structure in square ring shape, 36 meters wide, 9.5 meters height (7.5 meter draft). Features Ideol's Damping Pool® …”
supportsTurbinesModelUnit capacityTotal capacityFoundation+5 more
[3]
BW Ideol2018-09-18◆ Floating wind demonstrator | Ideol
“The connection of the electricity export cable and a final series of tests carried out in recent days enabled the Floatgen wind turbine, which is installed 22 kilometres off Le Croisic (Loire-Atlantiq…”
supportsFinal investment decisionFirst powerCommercial operationCOD history
[5]
BW Ideol2016-06◆ The construction of Floatgen is official…
“Construction will get off the ground in September in Saint-Nazaire Port, where Bouygues Travaux Publics will build the floating foundation. ... The construction of Floatgen is officially underway ... …”
supportsOnshore constructionOffshore constructionSite rightsassembly
[8]
Ecole Centrale de Nantes2024
“FLOATGEN is co-financed by the European Commission's 7th Framework Programme for Research and Technological Innovation. Setting off late afternoon on Sunday 29th April, it took them about a day to tra…”
supportsMechanismDetail
[10]
Centrale Nantes / eoliennesenmer.fr (French state EMR portal)2021-11
“Un suivi obligatoire dans le cadre des exigences d'autorisation d'occupation du domaine public maritime (Arrêté n°2014/BPUP/001 du 13 janvier 2014) et de l'arrêté inter-préfectoral portant d'autorisat…”
supportsConsent
Trade press3
[7]
WindEurope2017-10-13
“On 13 October, the Floatgen project, which aims at demonstrating the technical and economic feasibility of floating wind turbines, was officially inaugurated. This will be the first offshore wind turb…”
supportsBackground
[9]
BW Ideol2024◆ Floating platform | Offshore wind power
supportsoperator
[11]
DTU Wind Energy / World Bank (Global Wind Atlas)2026
supportsMean wind speed