Tahkoluoto
Located approximately 1.2 km off the Tahkoluoto peninsula near Pori, in the Gulf of Bothnia.
Status
Operationallifecycle stage
Ownership
SHSuomen Hyötytuuli Oy — 100% ◆
Location
Gulf of Bothnia
Technology
Capacity
42 MW ◆
Turbines
10 × 4.2 MW ◆
Model
Siemens Swt 4-0-130 ◆
Foundation
GBS ◆
Site & conditions
Site rights
Seabed rights held ∴
Water depth
1–20 m ≈
Distance from shore
1.2 km ◆
Wind speed
8.5 m/s @ 100 m ≈
Revenue & grid
Offtake
FiT ◆
Grid
Secured ◆
Schedule
FID
2015 ∅
COD
2017-Q3 ◆
Project timeline verified milestones only — each date carries its provenance mark
Dashed tick marks today (9 Sep 2026).
Revenue & offtake the regime the project was built under
Offtake regime on record
RegimeFinnish feed-in tariff (tuotantotuki) under Act on Production Subsidy for Electricity Produced from Renewable Energy Sources (1396/2010), target price 83.5 EUR/MWh for 12 years
InstrumentFiT
A built project sells its power under the contract or support regime it was financed with; it is not expected to bid into new government offtake rounds. Where the record does not yet name that regime, the row says so rather than guessing.
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation complete
not yet surveyed by satellite; the built farm can be, on request
Installation · on record
StageOperational
In operation since2017-Q3
Offshore construction2016 → 2017-Q3
Construction ports
PortPort of Pori ◆
Sources & verification
15/18 fields verified · rests on 11 sources (6 primary) · ◆ 2 documents held
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator5
[1]
[4]
Jan De Nul Group2026-06-16
“In 2016, Jan De Nul Group carried out preparatory works … In 2017, we installed the steel gravity-based foundations and the wind turbines. In the autumn of 2017, the wind farm was ready for use … Tahk…”
supportsFoundationport
[7]
[9]
Suomen Hyotytuuli2024
“the current Tahkoluoto offshore wind farm will be owned by the new Suomen Hyötytuuli Oy”
supportsoperator
[10]
Lappeenrannan Energia Oy2017-11-30
“Lappeenrannan Energian osittain omistama Suomen Hyötytuuli Oy juhli elokuussa maailman ensimmäisen jääolosuhteisiin suunnitellun merituulipuiston käyttöönottoa. ... Tahkoluoto tuotti osakkailleen sähk…”
supportsFirst power
Trade press5
[2]
offshoreWIND.biz2017-09-04
Press report — cited, not quoted; read it at the source link.
supportsCommercial operationTotal capacity
[3]
[5]
WindEurope2017-09◆ Finland opens its first offshore wind fa…
“42 MW Tahkoluoto wind farm … officially opened … ahead of schedule … first offshore wind farm designed for icy conditions … 83,5 €/MWh for 12 years … 1,2 kilometres from shore … 9 metres [water depth]”
supportsTotal capacityMechanismDetailDistance from shore
[12]
[13]
Encyclopaedic1
[11]
Wikipedia (Finnish)2026-07
“Voimalapuiston kaavoitus käynnistyi 2013 ja lainvoimaiset rakennusluvat saatiin vuoden 2015 maaliskuussa, lainvoimainen osayleiskaava elokuussa ja vesilain edellyttämä lupa joulukuussa.”
supportsConsentConsent granted