San Borondon

Located off southeast coast of Gran Canaria, Canary Islands. Iberdrola describes total programme as up to 300 MW of clean energy off the Spanish coast.

Status
Proposedlifecycle stage
Ownership
Iberdrola — 100% 
Location
Spain
Northeast Atlantic
Technology
Capacity 238 MW  Turbines 17 × 14 MW  Foundation Floating 
Site & conditions
Site rights Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project 
Water depth 50–200 m 
Revenue & grid
Offtake Other 
Grid
Schedule
FID Not taken
COD · developer 2032 announced 

Delivery outlook not forecast

We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.

Revenue & offtake route to market — open

No offtake secured — route to market open

None (awaiting first Spanish floating offshore wind auction)

The routes describe what exists in this market — not a prediction of which the project will take.
Next visible round · from the auction calendar
Spain first offshore wind auction
expected — · planned · the round’s published documents do not name this project
indicative

Installation how the build is going · from satellite counts and Hafrok’s registers

Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operation2032
Construction ports
PortPuerto de La Luz (Las Palmas de Gran Canaria) operations base

Sources & verification

1/14 fields verified · rests on 8 sources · ◆ 1 document held
VerifiedModelledSourcedInferredConventionUnverifiedNo source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Operator1
[1]
Iberdrola2021-06
“Iberdrola plans first industrial-scale floating offshore wind farm in Spain with an investment of more than €1 billion”
supportsCommercial operationFoundation
Auction pipeline1
[8]
MITECO (Spain)2026
RD 962/2024 framework; draft auction order consultation ran 4-24 Feb 2026 (two-sided CfD, floating, POEM zones); order not yet adopted, no call as of mid-2026. Target 1-3 GW by 2030.
supportsSpain first offshore wind auction
Trade press6
[2]
Canarias72021-06-03◆ Iberdrola prevé 17 molinos de 14 MW en e…
“17 turbines of 14 MW each... floating foundation systems (sistemas de cimentación flotante) on steel semi-submersible platforms... Area: 44 square kilometers, distance from shore: ~3 kilometres, water…”
supportsTurbinesUnit capacityFoundationWater depthoperations base
[3]
Enerdata2021-06-04
Press report — cited, not quoted; read it at the source link.
supportsConsentTotal capacity
[4]
Power Technology (GlobalData)
Press report — cited, not quoted; read it at the source link.
supportsTurbinesUnit capacityTotal capacityFoundation
[5]
Offshore Wind Biz2026-02-04
Press report — cited, not quoted; read it at the source link.
supportsMechanismDetailOfftake history
[6]
Power Technology2024
Press report — cited, not quoted; read it at the source link.
supportsoperator
[7]
Global Energy Monitor2026-07-02
supportsCoordinates