Liivi Bay Enefit
Technology
Capacity
1,000 MW ◇
Turbines
—
Foundation
—
Site & conditions
Site rights
Not established we have not found a document granting or refusing rights over this seabed — a gap in our research, not a finding about the project ∅
Water depth
18–26 m ≈
Wind speed
9.4 m/s @ 150 m ≈
Revenue & grid
Offtake
—
Grid
—
Schedule
FID
Not taken
COD · developer
—
Delivery outlook not forecast
We don't put a delivery estimate on this project yet. No authority has granted rights to this site, so there is nothing to date a schedule from. That changes the moment the seabed is awarded, a consent application is filed, or the project is named in an auction.
Revenue & offtake route to market — open
No offtake secured — route to market open
The routes describe what exists in this market — not a prediction of which the project will take.
Next visible round · from the auction calendar
ELWIND (Estonia-Latvia joint project) rights auction ◇
indicative
Installation how the build is going · from satellite counts and Hafrok’s registers
Installation not started
nothing to count yet: the satellite tracker begins when offshore construction does
Installation · on record
StageProposed
Offshore constructionnot started
Expected start of operationnot stated
Sources & verification
0/9 fields verified · rests on 5 sources (1 primary)
◆Verified≈Modelled◇Sourced∴Inferred⌁Convention○Unverified∅No source·Derived
Numbers are stable citation ids — grouped by source class, so they are not consecutive.
Auction pipeline1
[6]
ELWIND (Estonia/Latvia)2026
ELWIND (EE-LV, up to 1 GW) — rights to be auctioned 2026 after studies/permits; CEF co-funded.
supportsELWIND (Estonia-Latvia joint project) rights auction
Trade press4
[1]
offshoreWIND.biz2025
Press report — cited, not quoted; read it at the source link.
supportsownerTotal capacity
[2]
The Wind Power2025
Press report — cited, not quoted; read it at the source link.
supportsCoordinates